Inspection Complete🔧 Renovation/Alteration💵 This project involves public funds, public land, or is a Federally funded roadway project.

CTR FOR SOCIETY LAW & JUSTICE - TX STATE

5511 PARKCREST STE 204, Austin, TX 78731, Austin, TX, 78731
Final Inspection85%

📊Project Metrics

TDLR #EABPRJA8000008
Not disclosed
Project Value
Square Feet
Cost/SqFt
109y 2mo
Duration
Registered:Sep 11, 2007
Start:Jan 1, 1900
Target:Aug 6, 2007

Inspection Complete

Final inspection completed, awaiting project closure

📋Scope of Work

LEASE PERIOD 08062007 THRU 08052008767 SFT

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

📅Compliance Timeline

Project Registered
September 11, 2007
Construction Start
January 1, 1900
Expected Completion
August 6, 2007

📄Related City Permits

Building permits found at or near this location

5511 JOE SAYERS AVE

TCEQ-Compliant Components: * 1¿ DCA Backflow Preventer (In-Ground): Required by TCEQ to protect the public water supply from contamination. This device will be tested and registered with the city upon completion. * 1¿ Isolation Valve: Also required by TCEQ this allows for emergency shutoff of the irrigation system without affecting the homes water supply. * Two 1¿ Master Valves (One Per Controller): As per TCEQ code a master valve is required for each controller to help prevent line leaks or water loss when the system is off. Irrigation Zones: * Four Irrigreen Rotor Zones: These precision digital rotors map watering patterns for each turf zone reducing overspray and maximizing efficiency. * Two Drip Irrigation Zones: Installed for landscape beds these zones use subsurface drip tubing with 12¿ emitter spacing to deliver water directly to plant roots. Installation Details: * Trenching: All piping will be installed at 8¿10 inches deep using trenchers or hand tools depending on site conditions. * Controllers and Wiring: System will include complete controller installation wiring and testing.

ActivePlumbing PermitIrrigationNov 2025
View Details
2025-141415 PP
5511 MOUNT BONNELL RD

addition to expand existing main bedroom kitchen remodel

ActiveBuilding PermitAddition and RemodelOct 2025
$1
View Details
2025-137325 BP
🔧RM Builders LLC
5511 VAN WINKLE LN

Express: Remove and replace 33 windows (like for like)

ActiveBuilding PermitRepairOct 2025
$1
View Details
2025-133574 BP
🔧Trinity Exterior Group, LP *MAIN*
5511 FORKS RD

irrigation install

FinalPlumbing PermitIrrigationOct 2025
View Details
2025-125469 PP
5511 JOE SAYERS AVE

Construct new driveway approach of 12 FT. No sidewalk inspection per plan review.

FinalDriveway / SidewalksNewOct 2025
View Details
2022-085445 DS
🔧Bear Meadow LLC

Quick Actions

TDLR ID: EABPRJA8000008

Property Owner

👤
BILL D WARREN
View company profile
BILL D WARREN 5511 PARKCREST STE 101, AUSTIN, TX 78731

Tenant

🏢
TEXAS STATE UNIVERSITY