CEDAR HILL FIRE STATIONS NO. 1 & 3 SHELL
1212 N. BELTLINE RD., Cedar Hill, TX, 75104
CEDAR HILL FIRE STATIONS NO. 1 & 3 SHELL is a additions to existing building project at 1212 N. BELTLINE RD., Cedar Hill, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2009). The project has an estimated value of $525K.
- Estimated project value
- $525K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
1 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
122 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75104 (Cedar Hill)
One email per change. Unsubscribe in one click. Privacy.
CEDAR HILL FIRE STATIONS NO. 1 & 3 SHELL is a Additions to Existing Building project located at 1212 N. BELTLINE RD., Cedar Hill, TX 75104 in Cedar Hill, Texas. The project has an estimated value of $525K. CEDAR HILL FIRE DEPARTMENT is the property owner and BRW ARCHITECTS INC. is the design firm of record. The project was registered with TDLR on October 2, 2008.
Frequently Asked Questions
What is CEDAR HILL FIRE STATIONS NO. 1 & 3 SHELL?
CEDAR HILL FIRE STATIONS NO. 1 & 3 SHELL is a additions to existing building project at 1212 N. BELTLINE RD. in Cedar Hill, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Shell Addition to Existing Fire Station.
Is CEDAR HILL FIRE STATIONS NO. 1 & 3 SHELL open in Cedar Hill?
Construction on CEDAR HILL FIRE STATIONS NO. 1 & 3 SHELL is complete — TDLR records show the project passed its required accessibility inspection in Feb 2009. The building is finished and very likely open.
Where is CEDAR HILL FIRE STATIONS NO. 1 & 3 SHELL located?
CEDAR HILL FIRE STATIONS NO. 1 & 3 SHELL is located at 1212 N. BELTLINE RD., Cedar Hill, TX, 75104, in Dallas County.
Who is the owner or developer of CEDAR HILL FIRE STATIONS NO. 1 & 3 SHELL?
CEDAR HILL FIRE DEPARTMENT is the property owner/developer of record for CEDAR HILL FIRE STATIONS NO. 1 & 3 SHELL, per its TDLR project registration.
Who is the architect or design firm for CEDAR HILL FIRE STATIONS NO. 1 & 3 SHELL?
BRW ARCHITECTS INC. is the design firm of record for CEDAR HILL FIRE STATIONS NO. 1 & 3 SHELL, according to its TDLR filing.
How much does CEDAR HILL FIRE STATIONS NO. 1 & 3 SHELL cost and how big is it?
CEDAR HILL FIRE STATIONS NO. 1 & 3 SHELL has an estimated construction value of $525K, based on its TDLR filing.
Scope of Work
Shell Addition to Existing Fire Station.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1212 N. BELTLINE RD., Cedar Hill, TX, 75104
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$991K totalWatch all construction in 75104 (Cedar Hill)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Cedar Hill?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.