2008 BOND ISSUE | BECKVILLE ISD
2008 BOND ISSUE | BECKVILLE ISD is a additions to existing building project at 4398 STATE HIGHWAY 149, Beckville, in Panola County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2009). The project has an estimated value of $1.2M.
๐Project Metrics
TDLR #EABPRJA9802624Project Closed
Project has been completed and closed
2008 BOND ISSUE | BECKVILLE ISD is a Additions to Existing Building project located at 4398 STATE HIGHWAY 149, Beckville, TX 75631 in Beckville, Texas. The project has an estimated value of $1.2M. BECKVILLE INDEPENDENT SCHOOL DISTRICT is the property owner and THACKER | DAVIS ARCHITECTS INC. is the design firm of record. The project was registered with TDLR on October 16, 2008.
โFrequently Asked Questions
What is 2008 BOND ISSUE | BECKVILLE ISD?
2008 BOND ISSUE | BECKVILLE ISD is a additions to existing building project at 4398 STATE HIGHWAY 149 in Beckville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The expansion of the existing Sunset Elementary School includes a four classroom addition with enclosed corridor
Is 2008 BOND ISSUE | BECKVILLE ISD open in Beckville?
Construction on 2008 BOND ISSUE | BECKVILLE ISD is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2009. The building is finished and very likely open.
Where is 2008 BOND ISSUE | BECKVILLE ISD located?
2008 BOND ISSUE | BECKVILLE ISD is located at 4398 STATE HIGHWAY 149, Beckville, TX, 75631, in Panola County.
Who is the owner or developer of 2008 BOND ISSUE | BECKVILLE ISD?
BECKVILLE INDEPENDENT SCHOOL DISTRICT is the property owner/developer of record for 2008 BOND ISSUE | BECKVILLE ISD, per its TDLR project registration.
Who is the architect or design firm for 2008 BOND ISSUE | BECKVILLE ISD?
THACKER | DAVIS ARCHITECTS INC. is the design firm of record for 2008 BOND ISSUE | BECKVILLE ISD, according to its TDLR filing.
How much does 2008 BOND ISSUE | BECKVILLE ISD cost and how big is it?
2008 BOND ISSUE | BECKVILLE ISD has an estimated construction value of $1.2M, based on its TDLR filing.
๐Scope of Work
The expansion of the existing Sunset Elementary School includes a four classroom addition with enclosed corridor
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 16, 2008
Review Complete
Inspection Complete
Closed
Aug 1, 2009