Project intelligenceTDLR EABPRJA9803400New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

TRAFFIC SIGNAL INSTALLATION in Pearland, TX

SOUTHFORK DRIVE, Pearland, TX, 77584

Construction complete · Jul 2009Project Closed

TRAFFIC SIGNAL INSTALLATION is a new construction project at SOUTHFORK DRIVE, Pearland, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2009). The project has an estimated value of $525K.

Estimated project value
$525K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 30, 2008244 days across supplied datesJul 1, 2009

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    122 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    122 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77584 (Pearland)

One email per change. Unsubscribe in one click. Privacy.

TRAFFIC SIGNAL INSTALLATION is a New Construction project located at SOUTHFORK DRIVE, Pearland, TX 77584 in Pearland, Texas. The project has an estimated value of $525K. CITY OF PEARLAND is the property owner and TEDSI INFRASTRUCTURE GROUP is the design firm of record. The project was registered with TDLR on October 30, 2008.

Frequently Asked Questions

What is TRAFFIC SIGNAL INSTALLATION?

TRAFFIC SIGNAL INSTALLATION is a new construction project at SOUTHFORK DRIVE in Pearland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of Traffic Signals, Turn lanes, PedsetrianSignals, Sidewalk Modification, Crosswalks and Wheelchai

Is TRAFFIC SIGNAL INSTALLATION open in Pearland?

Construction on TRAFFIC SIGNAL INSTALLATION is complete — TDLR records show the project passed its required accessibility inspection in Jul 2009. The building is finished and very likely open.

Where is TRAFFIC SIGNAL INSTALLATION located?

TRAFFIC SIGNAL INSTALLATION is located at SOUTHFORK DRIVE, Pearland, TX, 77584, in Brazoria County.

Who is the owner or developer of TRAFFIC SIGNAL INSTALLATION?

CITY OF PEARLAND is the property owner/developer of record for TRAFFIC SIGNAL INSTALLATION, per its TDLR project registration.

Who is the architect or design firm for TRAFFIC SIGNAL INSTALLATION?

TEDSI INFRASTRUCTURE GROUP is the design firm of record for TRAFFIC SIGNAL INSTALLATION, according to its TDLR filing.

How much does TRAFFIC SIGNAL INSTALLATION cost and how big is it?

TRAFFIC SIGNAL INSTALLATION has an estimated construction value of $525K, based on its TDLR filing.

Scope of Work

Installation of Traffic Signals, Turn lanes, PedsetrianSignals, Sidewalk Modification, Crosswalks and Wheelchai

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

SOUTHFORK DRIVE, Pearland, TX, 77584

Loading location map…
29.54135, -95.38965

Watch all construction in 77584 (Pearland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Pearland?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.