Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
CEDAR PARK FIELD OPERATIONS SRVC CENTER
2401 183A TOLL ROAD, Cedar Park, TX, 78613
CEDAR PARK FIELD OPERATIONS SRVC CENTER is a new construction project at 2401 183A TOLL ROAD, Cedar Park, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2012). The project has an estimated value of $3.3M.
- Estimated project value
- $3.3M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
51 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
1,095 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78613 (Cedar Park)
One email per change. Unsubscribe in one click. Privacy.
CEDAR PARK FIELD OPERATIONS SRVC CENTER is a New Construction project located at 2401 183A TOLL ROAD, Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $3.3M. CITY OF CEDAR PARK is the property owner and WALLACE GROUP, THE is the design firm of record. The project was registered with TDLR on November 11, 2008.
Frequently Asked Questions
What is CEDAR PARK FIELD OPERATIONS SRVC CENTER?
CEDAR PARK FIELD OPERATIONS SRVC CENTER is a new construction project at 2401 183A TOLL ROAD in Cedar Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Administrative support spaces, along with service shopsfor the Pump & Motor and Water Departments for the City
Is CEDAR PARK FIELD OPERATIONS SRVC CENTER open in Cedar Park?
Construction on CEDAR PARK FIELD OPERATIONS SRVC CENTER is complete — TDLR records show the project passed its required accessibility inspection in Jan 2012. The building is finished and very likely open.
Where is CEDAR PARK FIELD OPERATIONS SRVC CENTER located?
CEDAR PARK FIELD OPERATIONS SRVC CENTER is located at 2401 183A TOLL ROAD, Cedar Park, TX, 78613, in Williamson County.
Who is the owner or developer of CEDAR PARK FIELD OPERATIONS SRVC CENTER?
CITY OF CEDAR PARK is the property owner/developer of record for CEDAR PARK FIELD OPERATIONS SRVC CENTER, per its TDLR project registration.
Who is the architect or design firm for CEDAR PARK FIELD OPERATIONS SRVC CENTER?
WALLACE GROUP, THE is the design firm of record for CEDAR PARK FIELD OPERATIONS SRVC CENTER, according to its TDLR filing.
How much does CEDAR PARK FIELD OPERATIONS SRVC CENTER cost and how big is it?
CEDAR PARK FIELD OPERATIONS SRVC CENTER has an estimated construction value of $3.3M, based on its TDLR filing.
Scope of Work
Administrative support spaces, along with service shopsfor the Pump & Motor and Water Departments for the City
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2401 183A TOLL ROAD, Cedar Park, TX, 78613
Related Projects
Same Owner
$252.7M totalRelated City Permits
Building permits found at or near this location
Replace existing 200-amp service with new 350-amp service including a 320-amp meter base a new 3 overhead riser a new 200-amp main electrical panel and a 150-amp panel.
Change of use to admin/business office and small tenant improvement project renovate break room and bathroom change out lighting throughout.
Change of use to admin/business office and small tenant improvement project renovate break room and bathroom change out lighting throughout.
Change of use to admin/business office and small tenant improvement project renovate break room and bathroom change out lighting throughout.
Remove existing property owner valve Install new ball valve on owner side of service line (within 5 ft of meter) Tie into existing piping Backfill and compact as needed Test system for proper operation and leakS
Watch all construction in 78613 (Cedar Park)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Cedar Park?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.