LEE MIDDLE SCHOOL PACK B ADA UPGRADES

401 E. GRAND PRAIRIE RD., Grand Prairie, TX, 75051

Construction complete · Sep 2009Project Closed

LEE MIDDLE SCHOOL PACK B ADA UPGRADES is a renovation/alteration project at 401 E. GRAND PRAIRIE RD., Grand Prairie, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2009). The project has an estimated value of $1.5M.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
10 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 1, 2008304 days across supplied datesSep 1, 2009

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    17 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    287 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75051 (Grand Prairie)

One email per change. Unsubscribe in one click. Privacy.

LEE MIDDLE SCHOOL PACK B ADA UPGRADES is a Renovation/Alteration project located at 401 E. GRAND PRAIRIE RD., Grand Prairie, TX 75051 in Grand Prairie, Texas. The project has an estimated value of $1.5M. GRAND PRAIRIE ISD is the property owner and PBK ARCHITECTS INC. is the design firm of record. The project was registered with TDLR on November 18, 2008.

Frequently Asked Questions

What is LEE MIDDLE SCHOOL PACK B ADA UPGRADES?

LEE MIDDLE SCHOOL PACK B ADA UPGRADES is a renovation/alteration project at 401 E. GRAND PRAIRIE RD. in Grand Prairie, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Athletic Track, restroom upgrades, concession area, paving and elevator

Is LEE MIDDLE SCHOOL PACK B ADA UPGRADES open in Grand Prairie?

Construction on LEE MIDDLE SCHOOL PACK B ADA UPGRADES is complete — TDLR records show the project passed its required accessibility inspection in Sep 2009. The building is finished and very likely open.

Where is LEE MIDDLE SCHOOL PACK B ADA UPGRADES located?

LEE MIDDLE SCHOOL PACK B ADA UPGRADES is located at 401 E. GRAND PRAIRIE RD., Grand Prairie, TX, 75051, in Dallas County.

Who is the owner or developer of LEE MIDDLE SCHOOL PACK B ADA UPGRADES?

GRAND PRAIRIE ISD is the property owner/developer of record for LEE MIDDLE SCHOOL PACK B ADA UPGRADES, per its TDLR project registration.

Who is the architect or design firm for LEE MIDDLE SCHOOL PACK B ADA UPGRADES?

PBK ARCHITECTS INC. is the design firm of record for LEE MIDDLE SCHOOL PACK B ADA UPGRADES, according to its TDLR filing.

How much does LEE MIDDLE SCHOOL PACK B ADA UPGRADES cost and how big is it?

LEE MIDDLE SCHOOL PACK B ADA UPGRADES has an estimated construction value of $1.5M, based on its TDLR filing.

Scope of Work

Athletic Track, restroom upgrades, concession area, paving and elevator

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

401 E. GRAND PRAIRIE RD., Grand Prairie, TX, 75051

32.74222, -97.00001

Watch all construction in 75051 (Grand Prairie)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Grand Prairie?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.