MCDONALDS #25208
MCDONALDS #25208 is a renovation/alteration project at 103 E. PRINCETON DR, Princeton, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2009). The project has an estimated value of $55K.
๐Project Metrics
TDLR #EABPRJA9805269Project Closed
Project has been completed and closed
MCDONALDS #25208 is a Renovation/Alteration project located at 103 E. PRINCETON DR, Princeton, TX 75407 in Princeton, Texas. The project has an estimated value of $55K. NATHAN BRINKLEY is the property owner and LARSEN + ASSOCIATES is the design firm of record. The project was registered with TDLR on December 8, 2008.
โFrequently Asked Questions
What is MCDONALDS #25208?
MCDONALDS #25208 is a renovation/alteration project at 103 E. PRINCETON DR in Princeton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacing existing beverage equipment @ drive thru booth
Is MCDONALDS #25208 open in Princeton?
Construction on MCDONALDS #25208 is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2009. The building is finished and very likely open.
Where is MCDONALDS #25208 located?
MCDONALDS #25208 is located at 103 E. PRINCETON DR, Princeton, TX, 75407, in Collin County.
Who is the owner or developer of MCDONALDS #25208?
NATHAN BRINKLEY is the property owner/developer of record for MCDONALDS #25208, per its TDLR project registration.
Who is the architect or design firm for MCDONALDS #25208?
LARSEN + ASSOCIATES is the design firm of record for MCDONALDS #25208, according to its TDLR filing.
How much does MCDONALDS #25208 cost and how big is it?
MCDONALDS #25208 has an estimated construction value of $55K, based on its TDLR filing.
๐Scope of Work
Replacing existing beverage equipment @ drive thru booth
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 8, 2008
Review Complete
Inspection Complete
Closed
Jan 1, 2009