Project intelligenceTDLR EABPRJA9806866Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

ALTERATIONS TO SOUTHWEST HIGH SCHOOL in Fort Worth, TX

4100 ALTAMESA BLVD., Fort Worth, TX, 76133

Construction complete · Jun 2010Project Closed

ALTERATIONS TO SOUTHWEST HIGH SCHOOL is a renovation/alteration project at 4100 ALTAMESA BLVD., Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2010). The project has an estimated value of $4.5M.

Estimated project value
$4.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 15, 2009502 days across supplied datesJun 1, 2010

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    76 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    426 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76133 (Fort Worth)

One email per change. Unsubscribe in one click. Privacy.

ALTERATIONS TO SOUTHWEST HIGH SCHOOL is a Renovation/Alteration project located at 4100 ALTAMESA BLVD., Fort Worth, TX 76133 in Fort Worth, Texas. The project has an estimated value of $4.5M. FORT WORTH INDEPENDENT SCHOOL DISTRICT is the property owner and HALBACH-DIETZ ARCHITECTS is the design firm of record. The project was registered with TDLR on January 15, 2009.

Frequently Asked Questions

What is ALTERATIONS TO SOUTHWEST HIGH SCHOOL?

ALTERATIONS TO SOUTHWEST HIGH SCHOOL is a renovation/alteration project at 4100 ALTAMESA BLVD. in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This project includes the installation of a fire sprinkler system, technology upgrades, repaving of existing par

Is ALTERATIONS TO SOUTHWEST HIGH SCHOOL open in Fort Worth?

Construction on ALTERATIONS TO SOUTHWEST HIGH SCHOOL is complete — TDLR records show the project passed its required accessibility inspection in Jun 2010. The building is finished and very likely open.

Where is ALTERATIONS TO SOUTHWEST HIGH SCHOOL located?

ALTERATIONS TO SOUTHWEST HIGH SCHOOL is located at 4100 ALTAMESA BLVD., Fort Worth, TX, 76133, in Tarrant County.

Who is the owner or developer of ALTERATIONS TO SOUTHWEST HIGH SCHOOL?

FORT WORTH INDEPENDENT SCHOOL DISTRICT is the property owner/developer of record for ALTERATIONS TO SOUTHWEST HIGH SCHOOL, per its TDLR project registration.

Who is the architect or design firm for ALTERATIONS TO SOUTHWEST HIGH SCHOOL?

HALBACH-DIETZ ARCHITECTS is the design firm of record for ALTERATIONS TO SOUTHWEST HIGH SCHOOL, according to its TDLR filing.

How much does ALTERATIONS TO SOUTHWEST HIGH SCHOOL cost and how big is it?

ALTERATIONS TO SOUTHWEST HIGH SCHOOL has an estimated construction value of $4.5M, based on its TDLR filing.

Scope of Work

This project includes the installation of a fire sprinkler system, technology upgrades, repaving of existing par

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4100 ALTAMESA BLVD., Fort Worth, TX, 76133

Loading location map…
32.65228, -97.38154

Related City Permits

Building permits found at or near this location

4100 ALTAMESA BLVD, Fort Worth, TX 76133
IssuedPlumbing BackflowBackflowSep 2026
FTW-PP26-18118
4100 ALTAMESA BLVD, Fort Worth, TX 76133
IssuedPlumbing BackflowBackflowMar 2026
FTW-PP26-05880

Watch all construction in 76133 (Fort Worth)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Fort Worth?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.