Project intelligenceTDLR EABPRJA9807950Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

HURRICANE DAMAGE RENOVATIONS PHASE 2 in Alvin, TX

3110 MUSTANG RD., Alvin, TX, 77511

Target date passed (Nov 2009)Review Complete

HURRICANE DAMAGE RENOVATIONS PHASE 2 is a renovation/alteration project at 3110 MUSTANG RD., Alvin, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Nov 2009 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $6.3M.

Estimated project value
$6.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 9, 2009265 days across supplied datesNov 1, 2009

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    20 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    245 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77511 (Alvin)

One email per change. Unsubscribe in one click. Privacy.

HURRICANE DAMAGE RENOVATIONS PHASE 2 is a Renovation/Alteration project located at 3110 MUSTANG RD., Alvin, TX 77511 in Alvin, Texas. The project has an estimated value of $6.3M. ALVIN COMMUNITY COLLEGE is the property owner and SBWV ARCHITECTS is the design firm of record. The project was registered with TDLR on February 9, 2009.

Frequently Asked Questions

What is HURRICANE DAMAGE RENOVATIONS PHASE 2?

HURRICANE DAMAGE RENOVATIONS PHASE 2 is a renovation/alteration project at 3110 MUSTANG RD. in Alvin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Repairs and renovations as a result of damage caused byhurricane Ike

Is HURRICANE DAMAGE RENOVATIONS PHASE 2 open in Alvin?

HURRICANE DAMAGE RENOVATIONS PHASE 2 was scheduled to finish construction in Nov 2009 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is HURRICANE DAMAGE RENOVATIONS PHASE 2 located?

HURRICANE DAMAGE RENOVATIONS PHASE 2 is located at 3110 MUSTANG RD., Alvin, TX, 77511, in Brazoria County.

Who is the owner or developer of HURRICANE DAMAGE RENOVATIONS PHASE 2?

ALVIN COMMUNITY COLLEGE is the property owner/developer of record for HURRICANE DAMAGE RENOVATIONS PHASE 2, per its TDLR project registration.

Who is the architect or design firm for HURRICANE DAMAGE RENOVATIONS PHASE 2?

SBWV ARCHITECTS is the design firm of record for HURRICANE DAMAGE RENOVATIONS PHASE 2, according to its TDLR filing.

How much does HURRICANE DAMAGE RENOVATIONS PHASE 2 cost and how big is it?

HURRICANE DAMAGE RENOVATIONS PHASE 2 has an estimated construction value of $6.3M, based on its TDLR filing.

Scope of Work

Repairs and renovations as a result of damage caused byhurricane Ike

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3110 MUSTANG RD., Alvin, TX, 77511

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77511 (Alvin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.