Project intelligenceTDLR EABPRJA9809709Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

WALKER JR. HIGH SCHOOL RENOVATION

800 S. FAYE AVE., Monahans, TX, 79756

Construction complete · Dec 2009Project Closed

WALKER JR. HIGH SCHOOL RENOVATION is a renovation/alteration project at 800 S. FAYE AVE., Monahans, in Ward County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2009). The project has an estimated value of $2.0M.

Estimated project value
$2.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 18, 2009258 days across supplied datesDec 1, 2009

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    14 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    244 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79756 (Monahans)

One email per change. Unsubscribe in one click. Privacy.

WALKER JR. HIGH SCHOOL RENOVATION is a Renovation/Alteration project located at 800 S. FAYE AVE., Monahans, TX 79756 in Monahans, Texas. The project has an estimated value of $2.0M. MONAHANS-WICKETT-PYOTE ISD is the property owner and HUNTER CORRAL ASSOCIATES INC. is the design firm of record. The project was registered with TDLR on March 18, 2009.

Frequently Asked Questions

What is WALKER JR. HIGH SCHOOL RENOVATION?

WALKER JR. HIGH SCHOOL RENOVATION is a renovation/alteration project at 800 S. FAYE AVE. in Monahans, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovations to existing building

Is WALKER JR. HIGH SCHOOL RENOVATION open in Monahans?

Construction on WALKER JR. HIGH SCHOOL RENOVATION is complete — TDLR records show the project passed its required accessibility inspection in Dec 2009. The building is finished and very likely open.

Where is WALKER JR. HIGH SCHOOL RENOVATION located?

WALKER JR. HIGH SCHOOL RENOVATION is located at 800 S. FAYE AVE., Monahans, TX, 79756, in Ward County.

Who is the owner or developer of WALKER JR. HIGH SCHOOL RENOVATION?

MONAHANS-WICKETT-PYOTE ISD is the property owner/developer of record for WALKER JR. HIGH SCHOOL RENOVATION, per its TDLR project registration.

Who is the architect or design firm for WALKER JR. HIGH SCHOOL RENOVATION?

HUNTER CORRAL ASSOCIATES INC. is the design firm of record for WALKER JR. HIGH SCHOOL RENOVATION, according to its TDLR filing.

How much does WALKER JR. HIGH SCHOOL RENOVATION cost and how big is it?

WALKER JR. HIGH SCHOOL RENOVATION has an estimated construction value of $2.0M, based on its TDLR filing.

Scope of Work

Renovations to existing building

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

800 S. FAYE AVE., Monahans, TX, 79756

31.58608, -102.89644

Watch all construction in 79756 (Monahans)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Monahans?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.