MEDICAL OAKS PAVILION PHASE 3 in Austin, TX
12221 RENFERT WAY, Austin, TX, 78758
MEDICAL OAKS PAVILION PHASE 3 is a new construction project at 12221 RENFERT WAY, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2011). The project has an estimated value of $6.0M.
- Estimated project value
- $6.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 11mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
44 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
699 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78758 (Austin)
One email per change. Unsubscribe in one click. Privacy.
MEDICAL OAKS PAVILION PHASE 3 is a New Construction project located at 12221 RENFERT WAY, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $6.0M. HEALTHCARE FACILITIES DEVELOPMENT is the property owner and TAG INTERNATIONAL is the design firm of record. The project was registered with TDLR on May 18, 2009.
Frequently Asked Questions
What is MEDICAL OAKS PAVILION PHASE 3?
MEDICAL OAKS PAVILION PHASE 3 is a new construction project at 12221 RENFERT WAY in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 70,000sf medical office building
Is MEDICAL OAKS PAVILION PHASE 3 open in Austin?
Construction on MEDICAL OAKS PAVILION PHASE 3 is complete — TDLR records show the project passed its required accessibility inspection in May 2011. The building is finished and very likely open.
Where is MEDICAL OAKS PAVILION PHASE 3 located?
MEDICAL OAKS PAVILION PHASE 3 is located at 12221 RENFERT WAY, Austin, TX, 78758, in Travis County.
Who is the owner or developer of MEDICAL OAKS PAVILION PHASE 3?
HEALTHCARE FACILITIES DEVELOPMENT is the property owner/developer of record for MEDICAL OAKS PAVILION PHASE 3, per its TDLR project registration.
Who is the architect or design firm for MEDICAL OAKS PAVILION PHASE 3?
TAG INTERNATIONAL is the design firm of record for MEDICAL OAKS PAVILION PHASE 3, according to its TDLR filing.
How much does MEDICAL OAKS PAVILION PHASE 3 cost and how big is it?
MEDICAL OAKS PAVILION PHASE 3 has an estimated construction value of $6.0M, based on its TDLR filing.
Scope of Work
70,000sf medical office building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
12221 RENFERT WAY, Austin, TX, 78758
Related Projects
Same Owner
$22.3M totalRelated City Permits
Building permits found at or near this location
Finish out of an existing shell space for medical office
ePlan: Commercial Expedited Review - Finish out for the 6th Floor Hospital Med Tower Areas. (10300 SF)
Reroof - emergency department and postpartum. Existing hospital.
Finish out of an existing shell space for medical office
ePlan: Commercial Expedited Review - Interior Remodel to Existing Emergency Department at Hospital - Phase 2 (1007145 SF)
Watch all construction in 78758 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.