Project intelligenceTDLR EABPRJA9812591Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

FUJITSU TEN FINISH OUT SUITE 200 in Mcallen, TX

SOUTHWEST CENTRE BUSINESS PARK 5801 S Ware Road, Mcallen, TX, 78503

Construction complete · Aug 2009Project Closed

FUJITSU TEN FINISH OUT SUITE 200 is a renovation/alteration project at SOUTHWEST CENTRE BUSINESS PARK 5801 S Ware Road, Mcallen, in Hidalgo County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2009). The project has an estimated value of $425K.

Estimated project value
$425K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 1, 200992 days across supplied datesAug 1, 2009

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    19 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    73 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78503 (Mcallen)

One email per change. Unsubscribe in one click. Privacy.

FUJITSU TEN FINISH OUT SUITE 200 is a Renovation/Alteration project located at SOUTHWEST CENTRE BUSINESS PARK 5801 S Ware Road, Mcallen, TX 78503 in Mcallen, Texas. The project has an estimated value of $425K. KIM SUTTON is the property owner and WARREN GROUP ARCHITECTS INC., THE is the design firm of record. The project was registered with TDLR on May 20, 2009.

Frequently Asked Questions

What is FUJITSU TEN FINISH OUT SUITE 200?

FUJITSU TEN FINISH OUT SUITE 200 is a renovation/alteration project at SOUTHWEST CENTRE BUSINESS PARK 5801 S Ware Road in Mcallen, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Warehouse floor area 78,968 sq. ft Office tenant finishout floor area 5,000 sq. ft

Is FUJITSU TEN FINISH OUT SUITE 200 open in Mcallen?

Construction on FUJITSU TEN FINISH OUT SUITE 200 is complete — TDLR records show the project passed its required accessibility inspection in Aug 2009. The building is finished and very likely open.

Where is FUJITSU TEN FINISH OUT SUITE 200 located?

FUJITSU TEN FINISH OUT SUITE 200 is located at SOUTHWEST CENTRE BUSINESS PARK 5801 S Ware Road, Mcallen, TX, 78503, in Hidalgo County.

Who is the owner or developer of FUJITSU TEN FINISH OUT SUITE 200?

KIM SUTTON is the property owner/developer of record for FUJITSU TEN FINISH OUT SUITE 200, per its TDLR project registration.

Who is the architect or design firm for FUJITSU TEN FINISH OUT SUITE 200?

WARREN GROUP ARCHITECTS INC., THE is the design firm of record for FUJITSU TEN FINISH OUT SUITE 200, according to its TDLR filing.

How much does FUJITSU TEN FINISH OUT SUITE 200 cost and how big is it?

FUJITSU TEN FINISH OUT SUITE 200 has an estimated construction value of $425K, based on its TDLR filing.

Scope of Work

Warehouse floor area 78,968 sq. ft Office tenant finishout floor area 5,000 sq. ft

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

SOUTHWEST CENTRE BUSINESS PARK 5801 S Ware Road, Mcallen, TX, 78503

Loading location map…
26.15799, -98.26943

Watch all construction in 78503 (Mcallen)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.