Project intelligenceTDLR EABPRJA9813131New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

ALTO ISD ENTRANCE STREET

MEAN STING PKWY. @ HWY. 69N., Alto, TX, 75925

Construction complete · Aug 2009Project Closed

ALTO ISD ENTRANCE STREET is a new construction project at MEAN STING PKWY. @ HWY. 69N., Alto, in Cherokee County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2009). The project has an estimated value of $124K.

Estimated project value
$124K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 1, 200961 days across supplied datesAug 1, 2009

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    1 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    60 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75925 (Alto)

One email per change. Unsubscribe in one click. Privacy.

ALTO ISD ENTRANCE STREET is a New Construction project located at MEAN STING PKWY. @ HWY. 69N., Alto, TX 75925 in Alto, Texas. The project has an estimated value of $124K. ALTO INDEPENDENT SCHOOL DISTRICT is the property owner and EVERETT GRIFFITH JR. & ASSOCIATES INC. is the design firm of record. The project was registered with TDLR on June 2, 2009.

Frequently Asked Questions

What is ALTO ISD ENTRANCE STREET?

ALTO ISD ENTRANCE STREET is a new construction project at MEAN STING PKWY. @ HWY. 69N. in Alto, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction of street with sidewalks.

Is ALTO ISD ENTRANCE STREET open in Alto?

Construction on ALTO ISD ENTRANCE STREET is complete — TDLR records show the project passed its required accessibility inspection in Aug 2009. The building is finished and very likely open.

Where is ALTO ISD ENTRANCE STREET located?

ALTO ISD ENTRANCE STREET is located at MEAN STING PKWY. @ HWY. 69N., Alto, TX, 75925, in Cherokee County.

Who is the owner or developer of ALTO ISD ENTRANCE STREET?

ALTO INDEPENDENT SCHOOL DISTRICT is the property owner/developer of record for ALTO ISD ENTRANCE STREET, per its TDLR project registration.

Who is the architect or design firm for ALTO ISD ENTRANCE STREET?

EVERETT GRIFFITH JR. & ASSOCIATES INC. is the design firm of record for ALTO ISD ENTRANCE STREET, according to its TDLR filing.

How much does ALTO ISD ENTRANCE STREET cost and how big is it?

ALTO ISD ENTRANCE STREET has an estimated construction value of $124K, based on its TDLR filing.

Scope of Work

New construction of street with sidewalks.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

MEAN STING PKWY. @ HWY. 69N., Alto, TX, 75925

31.65069, -95.07270

Watch all construction in 75925 (Alto)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.