Project intelligenceTDLR EABPRJA9813192Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

2008 RESIDENTIAL STREET REBUILD in Arlington, TX

VARIOUS STREETS RIGHTS-OF-WAY, Arlington, TX, 76010

Construction complete · Feb 2011Project Closed

2008 RESIDENTIAL STREET REBUILD is a renovation/alteration project at VARIOUS STREETS RIGHTS-OF-WAY, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2011). The project has an estimated value of $365K.

Estimated project value
$365K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 3, 2009618 days across supplied datesFeb 11, 2011

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    90 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    528 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76010 (Arlington)

One email per change. Unsubscribe in one click. Privacy.

2008 RESIDENTIAL STREET REBUILD is a Renovation/Alteration project located at VARIOUS STREETS RIGHTS-OF-WAY, Arlington, TX 76010 in Arlington, Texas. The project has an estimated value of $365K. CITY OF ARLINGTON TEXAS is the property owner and ELDER ENGINEERING INC. is the design firm of record. The project was registered with TDLR on June 3, 2009.

Frequently Asked Questions

What is 2008 RESIDENTIAL STREET REBUILD?

2008 RESIDENTIAL STREET REBUILD is a renovation/alteration project at VARIOUS STREETS RIGHTS-OF-WAY in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Rebuild various City of Arlington residential streets i.e.: Field St., Ruth St., Glenhaven St., Menefee St., Cl

Is 2008 RESIDENTIAL STREET REBUILD open in Arlington?

Construction on 2008 RESIDENTIAL STREET REBUILD is complete — TDLR records show the project passed its required accessibility inspection in Feb 2011. The building is finished and very likely open.

Where is 2008 RESIDENTIAL STREET REBUILD located?

2008 RESIDENTIAL STREET REBUILD is located at VARIOUS STREETS RIGHTS-OF-WAY, Arlington, TX, 76010, in Tarrant County.

Who is the owner or developer of 2008 RESIDENTIAL STREET REBUILD?

CITY OF ARLINGTON TEXAS is the property owner/developer of record for 2008 RESIDENTIAL STREET REBUILD, per its TDLR project registration.

Who is the architect or design firm for 2008 RESIDENTIAL STREET REBUILD?

ELDER ENGINEERING INC. is the design firm of record for 2008 RESIDENTIAL STREET REBUILD, according to its TDLR filing.

How much does 2008 RESIDENTIAL STREET REBUILD cost and how big is it?

2008 RESIDENTIAL STREET REBUILD has an estimated construction value of $365K, based on its TDLR filing.

Scope of Work

Rebuild various City of Arlington residential streets i.e.: Field St., Ruth St., Glenhaven St., Menefee St., Cl

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

VARIOUS STREETS RIGHTS-OF-WAY, Arlington, TX, 76010

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76010 (Arlington)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Arlington?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.