VENTURA STREET RECONSTRUCTION PHASE 8 in San Antonio, TX
SEGUIN RD. & BEECH TRAIL, San Antonio, TX, 78244
VENTURA STREET RECONSTRUCTION PHASE 8 is a renovation/alteration project at SEGUIN RD. & BEECH TRAIL, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2010). The project has an estimated value of $80K.
- Estimated project value
- $80K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 4mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
22 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
487 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78244 (San Antonio)
One email per change. Unsubscribe in one click. Privacy.
VENTURA STREET RECONSTRUCTION PHASE 8 is a Renovation/Alteration project located at SEGUIN RD. & BEECH TRAIL, San Antonio, TX 78244 in San Antonio, Texas. The project has an estimated value of $80K. BEXAR COUNTY - PUBLIC WORKS is the property owner and UNINTECH CONSULTING ENGINEERS INC. is the design firm of record. The project was registered with TDLR on June 9, 2009.
Frequently Asked Questions
What is VENTURA STREET RECONSTRUCTION PHASE 8?
VENTURA STREET RECONSTRUCTION PHASE 8 is a renovation/alteration project at SEGUIN RD. & BEECH TRAIL in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Ventura Subdivision Phase 3 project to reconstruct eightstreets including sidewalk and curb ramp improvements.
Is VENTURA STREET RECONSTRUCTION PHASE 8 open in San Antonio?
Construction on VENTURA STREET RECONSTRUCTION PHASE 8 is complete — TDLR records show the project passed its required accessibility inspection in Oct 2010. The building is finished and very likely open.
Where is VENTURA STREET RECONSTRUCTION PHASE 8 located?
VENTURA STREET RECONSTRUCTION PHASE 8 is located at SEGUIN RD. & BEECH TRAIL, San Antonio, TX, 78244, in Bexar County.
Who is the owner or developer of VENTURA STREET RECONSTRUCTION PHASE 8?
BEXAR COUNTY - PUBLIC WORKS is the property owner/developer of record for VENTURA STREET RECONSTRUCTION PHASE 8, per its TDLR project registration.
Who is the architect or design firm for VENTURA STREET RECONSTRUCTION PHASE 8?
UNINTECH CONSULTING ENGINEERS INC. is the design firm of record for VENTURA STREET RECONSTRUCTION PHASE 8, according to its TDLR filing.
How much does VENTURA STREET RECONSTRUCTION PHASE 8 cost and how big is it?
VENTURA STREET RECONSTRUCTION PHASE 8 has an estimated construction value of $80K, based on its TDLR filing.
Scope of Work
Ventura Subdivision Phase 3 project to reconstruct eightstreets including sidewalk and curb ramp improvements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
SEGUIN RD. & BEECH TRAIL, San Antonio, TX, 78244
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Design Firm
$45.2M totalWatch all construction in 78244 (San Antonio)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in San Antonio?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.