THEATRE CTR INTERIOR RENOV. - PHASE III is a renovation/alteration project at 601 UNIVERSITY DR., San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2009). The project has an estimated value of $255K.
Project has been completed and closed
THEATRE CTR INTERIOR RENOV. - PHASE III is a Renovation/Alteration project located at 601 UNIVERSITY DR., San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $255K. TEXAS STATE UNIVERSITY - SAN MARCOS is the property owner and JOSHUA ENGINEERING GROUP INC. is the design firm of record. The project was registered with TDLR on July 8, 2009.
THEATRE CTR INTERIOR RENOV. - PHASE III is a renovation/alteration project at 601 UNIVERSITY DR. in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of 1st floor under Main Stage area and upgrade t architectural finishes for Main Entrance lobby.
Construction on THEATRE CTR INTERIOR RENOV. - PHASE III is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2009. The building is finished and very likely open.
THEATRE CTR INTERIOR RENOV. - PHASE III is located at 601 UNIVERSITY DR., San Marcos, TX, 78666, in Hays County.
TEXAS STATE UNIVERSITY - SAN MARCOS is the property owner/developer of record for THEATRE CTR INTERIOR RENOV. - PHASE III, per its TDLR project registration.
JOSHUA ENGINEERING GROUP INC. is the design firm of record for THEATRE CTR INTERIOR RENOV. - PHASE III, according to its TDLR filing.
THEATRE CTR INTERIOR RENOV. - PHASE III has an estimated construction value of $255K, based on its TDLR filing.
Renovation of 1st floor under Main Stage area and upgrade t architectural finishes for Main Entrance lobby.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jul 8, 2009
Review Complete
Inspection Complete
Closed
Sep 1, 2009
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Express: Foundation repair
Interior Remodel/Garage Conversion Interior bathroom addition within existing garage. Minor partition modifications plumbing fixtures ventilation and electrical work. No change to building footprint.
TPO Reroof. Existing union hall.
15 tunnel below the foundation to repair the broken wye on main for master toilet drain line. 1 access hole - left side beam penetration