Project intelligenceTDLR EABPRJA9816266Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

THE METHODIST HOSPITAL MOB III - PHASE 2

16605 SOUTHWEST FREEWAY Suite 410, Sugar Land, TX, 77479

Construction complete · Nov 2009Project Closed

THE METHODIST HOSPITAL MOB III - PHASE 2 is a renovation/alteration project at 16605 SOUTHWEST FREEWAY Suite 410, Sugar Land, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2009). The project has an estimated value of $180K.

Estimated project value
$180K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 1, 2009123 days across supplied datesNov 1, 2009

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    43 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    80 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77479 (Sugar Land)

One email per change. Unsubscribe in one click. Privacy.

THE METHODIST HOSPITAL MOB III - PHASE 2 is a Renovation/Alteration project located at 16605 SOUTHWEST FREEWAY Suite 410, Sugar Land, TX 77479 in Sugar Land, Texas. The project has an estimated value of $180K. METHODIST HOSPITAL MOB III, THE is the property owner and INVENTURE DESIGN is the design firm of record. The project was registered with TDLR on August 13, 2009.

Frequently Asked Questions

What is THE METHODIST HOSPITAL MOB III - PHASE 2?

THE METHODIST HOSPITAL MOB III - PHASE 2 is a renovation/alteration project at 16605 SOUTHWEST FREEWAY Suite 410 in Sugar Land, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant build out of clinical office space in the Methodist Hopital MOB III

Is THE METHODIST HOSPITAL MOB III - PHASE 2 open in Sugar Land?

Construction on THE METHODIST HOSPITAL MOB III - PHASE 2 is complete — TDLR records show the project passed its required accessibility inspection in Nov 2009. The building is finished and very likely open.

Where is THE METHODIST HOSPITAL MOB III - PHASE 2 located?

THE METHODIST HOSPITAL MOB III - PHASE 2 is located at 16605 SOUTHWEST FREEWAY Suite 410, Sugar Land, TX, 77479, in Fort Bend County.

Who is the owner or developer of THE METHODIST HOSPITAL MOB III - PHASE 2?

METHODIST HOSPITAL MOB III, THE is the property owner/developer of record for THE METHODIST HOSPITAL MOB III - PHASE 2, per its TDLR project registration.

Who is the architect or design firm for THE METHODIST HOSPITAL MOB III - PHASE 2?

INVENTURE DESIGN is the design firm of record for THE METHODIST HOSPITAL MOB III - PHASE 2, according to its TDLR filing.

How much does THE METHODIST HOSPITAL MOB III - PHASE 2 cost and how big is it?

THE METHODIST HOSPITAL MOB III - PHASE 2 has an estimated construction value of $180K, based on its TDLR filing.

Scope of Work

Tenant build out of clinical office space in the Methodist Hopital MOB III

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

16605 SOUTHWEST FREEWAY Suite 410, Sugar Land, TX, 77479

29.59017, -95.62922

Watch all construction in 77479 (Sugar Land)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Sugar Land?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.