Project intelligenceTDLR EABPRJB0806077New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

METRO SOLUTIONS TRANSIT PROJ-SEC SEG 1C

4500-4900 MLK JR BLVD, Houston, TX, 77004

Construction complete · Nov 2014Project Closed

METRO SOLUTIONS TRANSIT PROJ-SEC SEG 1C is a new construction project at 4500-4900 MLK JR BLVD, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2014). The project has an estimated value of $24.7M.

Estimated project value
$24.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4y 7mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 27, 20101,739 days across supplied datesNov 1, 2014

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    94 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    1,645 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77004 (Houston)

One email per change. Unsubscribe in one click. Privacy.

METRO SOLUTIONS TRANSIT PROJ-SEC SEG 1C is a New Construction project located at 4500-4900 MLK JR BLVD, Houston, TX 77004 in Houston, Texas. The project has an estimated value of $24.7M. HRT-JV INC is the property owner and LOCKWOOD ANDREWS & NEWNAM INC. is the design firm of record. The project was registered with TDLR on January 27, 2010.

Frequently Asked Questions

What is METRO SOLUTIONS TRANSIT PROJ-SEC SEG 1C?

METRO SOLUTIONS TRANSIT PROJ-SEC SEG 1C is a new construction project at 4500-4900 MLK JR BLVD in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of light rail transit system; removal and replacement of street pavement, ramps, sidewalks, public

Is METRO SOLUTIONS TRANSIT PROJ-SEC SEG 1C open in Houston?

Construction on METRO SOLUTIONS TRANSIT PROJ-SEC SEG 1C is complete — TDLR records show the project passed its required accessibility inspection in Nov 2014. The building is finished and very likely open.

Where is METRO SOLUTIONS TRANSIT PROJ-SEC SEG 1C located?

METRO SOLUTIONS TRANSIT PROJ-SEC SEG 1C is located at 4500-4900 MLK JR BLVD, Houston, TX, 77004, in Harris County.

Who is the owner or developer of METRO SOLUTIONS TRANSIT PROJ-SEC SEG 1C?

HRT-JV INC is the property owner/developer of record for METRO SOLUTIONS TRANSIT PROJ-SEC SEG 1C, per its TDLR project registration.

Who is the architect or design firm for METRO SOLUTIONS TRANSIT PROJ-SEC SEG 1C?

LOCKWOOD ANDREWS & NEWNAM INC. is the design firm of record for METRO SOLUTIONS TRANSIT PROJ-SEC SEG 1C, according to its TDLR filing.

How much does METRO SOLUTIONS TRANSIT PROJ-SEC SEG 1C cost and how big is it?

METRO SOLUTIONS TRANSIT PROJ-SEC SEG 1C has an estimated construction value of $24.7M, based on its TDLR filing.

Scope of Work

Installation of light rail transit system; removal and replacement of street pavement, ramps, sidewalks, public

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4500-4900 MLK JR BLVD, Houston, TX, 77004

29.70788, -95.33578

Watch all construction in 77004 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.