HEB AUSTIN #8
HEB AUSTIN #8 is a renovation/alteration project at 2400 SOUTH CONGRESS, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2010). The project has an estimated value of $818K.
๐Project Metrics
TDLR #EABPRJB0806680Project Closed
Project has been completed and closed
HEB AUSTIN #8 is a Renovation/Alteration project located at 2400 SOUTH CONGRESS, Austin, TX 78704 in Austin, Texas. The project has an estimated value of $818K. HEB is the property owner and ABSOLUTE DESIGN PARTNERS is the design firm of record. The project was registered with TDLR on February 9, 2010.
โFrequently Asked Questions
What is HEB AUSTIN #8?
HEB AUSTIN #8 is a renovation/alteration project at 2400 SOUTH CONGRESS in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Minor interior remodel of existing equipment, installation of exterior ramp, and relocation of existing restroom
Is HEB AUSTIN #8 open in Austin?
Construction on HEB AUSTIN #8 is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2010. The building is finished and very likely open.
Where is HEB AUSTIN #8 located?
HEB AUSTIN #8 is located at 2400 SOUTH CONGRESS, Austin, TX, 78704, in Travis County.
Who is the owner or developer of HEB AUSTIN #8?
HEB is the property owner/developer of record for HEB AUSTIN #8, per its TDLR project registration.
Who is the architect or design firm for HEB AUSTIN #8?
ABSOLUTE DESIGN PARTNERS is the design firm of record for HEB AUSTIN #8, according to its TDLR filing.
How much does HEB AUSTIN #8 cost and how big is it?
HEB AUSTIN #8 has an estimated construction value of $818K, based on its TDLR filing.
๐Scope of Work
Minor interior remodel of existing equipment, installation of exterior ramp, and relocation of existing restroom
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 9, 2010
Review Complete
Inspection Complete
Closed
Aug 1, 2010
๐Related Projects
๐คSame Owner
$5.19B total๐๏ธSame Design Firm
$151.2M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Temp power for Crane 2
Temp power for Crane 1
***PER COORDINATION WITH 24-164115 RW THIS PROJECT HAS CLEARED THE ROW. CONFLICT CHECK REQUIRED FOR EXTENSION*** ***PER COORDINATION WITH 24-070563 EX THIS PROJECT WILL CLEAR THE ROW ON 11/06/24. NO WORK TO OCCUR AFTER THIS DATE WITHOUT ADDITIONAL COORDINATION*** Construct 4 new driveway approaches of 30 FT each and sidewalk of 700 LF and curb & gutter of 700 FT.*shay DAPCZ Project: PVT-HEB Austin 8 Signal Improvements Inspection fees paid on 2023 057499 000 00 SSI
Addition of a Manual Transfer Switch to the building after the main service disconnect to provide capabilities to connect a TEMPORARY towable generator when needed during outages. The Manual Transfer Switch is equipped with an interlock mechanism that prevent utility and/or generator power to back feed each other.
**Replacing 2 HVAC Units
๐Related Site Plans
City of Austin site plan approvals at this location
Property Owner
Design Firm
Location Intelligence
Active businesses near this construction site
Business data from Google