Project has been completed and closed
DOUBLE FILE TRAIL ELEM- HVAC & INTERIOR is a Renovation/Alteration project located at 2400 CHANDLER CREEK BLVD, Round Rock, TX 78665 in Round Rock, Texas. The project has an estimated value of $1.1M. ROUND ROCK INDEPENDENT SCHOOL DISTRICT is the property owner and PFLUGER ASSOCIATES ARCHITECTS LP is the design firm of record. The project was registered with TDLR on March 9, 2010.
Renovate restrooms, replace gym flooring,replace classroom chalkboards with white boards, HVAC improvements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Mar 9, 2010
Review Complete
Inspection Complete
Closed
Sep 1, 2010
Building permits found at or near this location
Express: Foundation repair
Commercial rooftop Solar installation 770.18 kw DC.
Interior remodel Remodel Primary Bathroom -Move plumbing for shower toilet and vanities. Move Existing Partition walls between Primary Bathroom and Bedroom Approximately 4 ft. Add to Primary Partition Closet Wall to the new depth of Primary Bathroom. Electrical will be reconfigured with New Walls. Secondary Bathroom - Remove Existing shower and install tub shower in its place. Remove and install new plumbing valves and fixtures in same location
Interior remodel Remodel Primary Bathroom -Move plumbing for shower toilet and vanities. Move Existing Partition walls between Primary Bathroom and Bedroom Approximately 4 ft. Add to Primary Partition Closet Wall to the new depth of Primary Bathroom. Electrical will be reconfigured with New Walls. Secondary Bathroom - Remove Existing shower and install tub shower in its place. Remove and install new plumbing valves and fixtures in same location
Update 6/1/26 LS- 2 phase project. Both bathrooms are being remodel. GC will complete primary bathroom and then call in inspections for second guest bathroom. Interior remodel Remodel Primary Bathroom -Move plumbing for shower toilet and vanities. Move Existing Partition walls between Primary Bathroom and Bedroom Approximately 4 ft. Add to Primary Partition Closet Wall to the new depth of Primary Bathroom. Electrical will be reconfigured with New Walls. Secondary Bathroom - Remove Existing shower and install tub shower in its place. Remove and install new plumbing valves and fixtures in same location