SUITE 101
SUITE 101 is a renovation/alteration project at 1300 SMITH ROAD, SUITE 101, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2010). The project has an estimated value of $230K.
๐Project Metrics
TDLR #EABPRJB0813475Project Closed
Project has been completed and closed
SUITE 101 is a Renovation/Alteration project located at 1300 SMITH ROAD, SUITE 101, Austin, TX 78721 in Austin, Texas. The project has an estimated value of $230K. STONE GROUP, THE is the property owner and NOACKLITTLE ARCHITECTURE AND INTERIORS is the design firm of record. The project was registered with TDLR on July 7, 2010.
โFrequently Asked Questions
What is SUITE 101?
SUITE 101 is a renovation/alteration project at 1300 SMITH ROAD, SUITE 101 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: THE PROJECT IS AN INTERIOR & STRUCTURAL/ROOF RENOVATIONTO AN EXISTING SUITE WITHIN A ONE STORY BUILDING. THE
Is SUITE 101 open in Austin?
Construction on SUITE 101 is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2010. The building is finished and very likely open.
Where is SUITE 101 located?
SUITE 101 is located at 1300 SMITH ROAD, SUITE 101, Austin, TX, 78721, in Travis County.
Who is the owner or developer of SUITE 101?
STONE GROUP, THE is the property owner/developer of record for SUITE 101, per its TDLR project registration.
Who is the architect or design firm for SUITE 101?
NOACKLITTLE ARCHITECTURE AND INTERIORS is the design firm of record for SUITE 101, according to its TDLR filing.
How much does SUITE 101 cost and how big is it?
SUITE 101 has an estimated construction value of $230K, based on its TDLR filing.
๐Scope of Work
THE PROJECT IS AN INTERIOR & STRUCTURAL/ROOF RENOVATIONTO AN EXISTING SUITE WITHIN A ONE STORY BUILDING. THE
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 7, 2010
Review Complete
Inspection Complete
Closed
Oct 1, 2010
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Replacing galvanized and copper water pipe front yard and underneath home.
Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. There will be three access holds: one in front one on the side and one behind the house.
Main elctrica panel upgrade.
Replacement of complete existing central heat and air system with or without duct work
Install Level 2 EV Charger
๐Related Site Plans
City of Austin site plan approvals at this location