URGENT DOC
URGENT DOC is a renovation/alteration project at 4909 NORTH ST., SUITES 202-204, Nacogdoches, in Nacogdoches County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2010). The project has an estimated value of $250K.
๐Project Metrics
TDLR #EABPRJB0814241Project Closed
Project has been completed and closed
URGENT DOC is a Renovation/Alteration project located at 4909 NORTH ST., SUITES 202-204, Nacogdoches, TX 75965 in Nacogdoches, Texas. The project has an estimated value of $250K. HAUCK HOLDINGS NACOGDOCHES TX II LLC is the property owner and ARF ENGINEERING INC. is the design firm of record. The project was registered with TDLR on July 23, 2010.
โFrequently Asked Questions
What is URGENT DOC?
URGENT DOC is a renovation/alteration project at 4909 NORTH ST., SUITES 202-204 in Nacogdoches, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation to convert space to medical offices.
Is URGENT DOC open in Nacogdoches?
Construction on URGENT DOC is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2010. The building is finished and very likely open.
Where is URGENT DOC located?
URGENT DOC is located at 4909 NORTH ST., SUITES 202-204, Nacogdoches, TX, 75965, in Nacogdoches County.
Who is the owner or developer of URGENT DOC?
HAUCK HOLDINGS NACOGDOCHES TX II LLC is the property owner/developer of record for URGENT DOC, per its TDLR project registration.
Who is the architect or design firm for URGENT DOC?
ARF ENGINEERING INC. is the design firm of record for URGENT DOC, according to its TDLR filing.
How much does URGENT DOC cost and how big is it?
URGENT DOC has an estimated construction value of $250K, based on its TDLR filing.
๐Scope of Work
Renovation to convert space to medical offices.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 23, 2010
Review Complete
Inspection Complete
Closed
Nov 1, 2010