NORTHWEST C PUMP STATION AND ELEVATED ST
NORTHWEST C PUMP STATION AND ELEVATED ST is a new construction project at 12006 FM 2769, Cedar Park, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2014). The project has an estimated value of $10.0M.
๐Project Metrics
TDLR #EABPRJB1000375Project Closed
Project has been completed and closed
NORTHWEST C PUMP STATION AND ELEVATED ST is a New Construction project located at 12006 FM 2769, Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $10.0M. CITY OF AUSTIN - AUSTIN WATER UTILITY is the property owner and CP&Y INC is the design firm of record. The project was registered with TDLR on August 3, 2011.
โFrequently Asked Questions
What is NORTHWEST C PUMP STATION AND ELEVATED ST?
NORTHWEST C PUMP STATION AND ELEVATED ST is a new construction project at 12006 FM 2769 in Cedar Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: NEW 1.5 MG COMPOSITE ELEVATED STRGE TNK W PUMP STN INTEGRATED INTO BSE OF TNK 3 5.5 MGD PMPS PF175 RV575
Is NORTHWEST C PUMP STATION AND ELEVATED ST open in Cedar Park?
Construction on NORTHWEST C PUMP STATION AND ELEVATED ST is complete โ TDLR records show the project passed its required accessibility inspection in May 2014. The building is finished and very likely open.
Where is NORTHWEST C PUMP STATION AND ELEVATED ST located?
NORTHWEST C PUMP STATION AND ELEVATED ST is located at 12006 FM 2769, Cedar Park, TX, 78613, in Williamson County.
Who is the owner or developer of NORTHWEST C PUMP STATION AND ELEVATED ST?
CITY OF AUSTIN - AUSTIN WATER UTILITY is the property owner/developer of record for NORTHWEST C PUMP STATION AND ELEVATED ST, per its TDLR project registration.
Who is the architect or design firm for NORTHWEST C PUMP STATION AND ELEVATED ST?
CP&Y INC is the design firm of record for NORTHWEST C PUMP STATION AND ELEVATED ST, according to its TDLR filing.
How much does NORTHWEST C PUMP STATION AND ELEVATED ST cost and how big is it?
NORTHWEST C PUMP STATION AND ELEVATED ST has an estimated construction value of $10.0M, based on its TDLR filing.
๐Scope of Work
NEW 1.5 MG COMPOSITE ELEVATED STRGE TNK W PUMP STN INTEGRATED INTO BSE OF TNK 3 5.5 MGD PMPS PF175 RV575
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 3, 2011
Review Complete
Inspection Complete
Closed
May 1, 2014
๐Related Projects
๐๏ธSame Design Firm
$1.14B total๐Related City Permits
Building permits found at or near this location
Replace existing cast iron drain piping located beneath the residence with new PVC drain piping. Work will include tunneling beneath the structure as necessary to access and replace only the existing underground drain lines under the house. No yard line replacement or exterior sewer line replacement is included in this scope of work.
Replacement of complete existing central heat and air system with or without duct work Replacement of 3 ton Complete HVAC system
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system through City of Austins Home Energy Savings program
Installing a new irrigation system
1360EL NEW 1 STORY 3 BEDROOM 2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH AND REAR PATIO
Property Owner
Design Firm
Williamson County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Williamson County
Find General Contractors in Williamson