DAYSPRING FELLOWSHIP RESTROOM ADDITION
๐Project Metrics
TDLR #EABPRJB1804320Project Closed
Project has been completed and closed
๐Scope of Work
A 350 SF wood frame with brick veneer restroom addition.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replacing a 25 feet underground gas line from the meter.
Install EVSE
Excavate pier and beam home from exterior wall where sewer exits house to cast iron stack for middle bath. Remove collapsed Orangeburg piping in ground and existing cast iron. Repiping drains in 3 sch 40 pvc for entire bathroom group in hall bathroom. Includes new toilet piping and flange waste and overflow on tub drain and ptrap. Gravel back fill in trench for proper support hangers where necessary tieing in kitchen laundry and masterbath. 28ft total. Excavate building sewer outside running down driveway includes professional excavation and back fill gravel bedding for proper pipe support 70ft of 4 sch 40 pvc clean out removal and haul off concrete.
Express: Replace 26 windows like for like
Reroute washer drain from current location to new location as well as rerouting gas lines from dryer to new laundry room location 5413 Avenue G Austin TX 78751