Construction complete ยท Mar 2011๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project is privately funded, on private land for private use.

TEXAS INSTRUMENTS THIRD FLOOR PH 1

108 S. WILD BASIN Suite 300, Austin, TX 78746, Austin, TX, 78746

TEXAS INSTRUMENTS THIRD FLOOR PH 1 is a renovation/alteration project at 108 S. WILD BASIN Suite 300, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2011). The project has an estimated value of $213K.

Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB1805739
$213K
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
2 months
Duration
Registered:Jan 10, 2011
Start:Jan 1, 2011
Target:Mar 1, 2011
๐Ÿ

Project Closed

Project has been completed and closed

TEXAS INSTRUMENTS THIRD FLOOR PH 1 is a Renovation/Alteration project located at 108 S. WILD BASIN Suite 300, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $213K. HPI REAL ESTATE SERVICES is the property owner and KAMPFE DE STIJL is the design firm of record. The project was registered with TDLR on January 10, 2011.

โ“Frequently Asked Questions

What is TEXAS INSTRUMENTS THIRD FLOOR PH 1?

TEXAS INSTRUMENTS THIRD FLOOR PH 1 is a renovation/alteration project at 108 S. WILD BASIN Suite 300 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 4.1.6 Renovation Alteration of existing office space

Is TEXAS INSTRUMENTS THIRD FLOOR PH 1 open in Austin?

Construction on TEXAS INSTRUMENTS THIRD FLOOR PH 1 is complete โ€” TDLR records show the project passed its required accessibility inspection in Mar 2011. The building is finished and very likely open.

Where is TEXAS INSTRUMENTS THIRD FLOOR PH 1 located?

TEXAS INSTRUMENTS THIRD FLOOR PH 1 is located at 108 S. WILD BASIN Suite 300, Austin, TX, 78746, in Travis County.

Who is the owner or developer of TEXAS INSTRUMENTS THIRD FLOOR PH 1?

HPI REAL ESTATE SERVICES is the property owner/developer of record for TEXAS INSTRUMENTS THIRD FLOOR PH 1, per its TDLR project registration.

Who is the architect or design firm for TEXAS INSTRUMENTS THIRD FLOOR PH 1?

KAMPFE DE STIJL is the design firm of record for TEXAS INSTRUMENTS THIRD FLOOR PH 1, according to its TDLR filing.

How much does TEXAS INSTRUMENTS THIRD FLOOR PH 1 cost and how big is it?

TEXAS INSTRUMENTS THIRD FLOOR PH 1 has an estimated construction value of $213K, based on its TDLR filing.

๐Ÿ“‹Scope of Work

4.1.6 Renovation Alteration of existing office space

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
January 10, 2011
Project Closed
March 1, 2011
Construction Start
January 1, 2011
Expected Completion
March 1, 2011

๐Ÿ“…Project Timeline

Filed

Jan 10, 2011

Review Complete

Inspection Complete

Closed

Mar 1, 2011

๐Ÿ“Location & Views

Open in MapsGet Directions|30.30559, -97.82601

๐Ÿ“„Related City Permits

Building permits found at or near this location

10809 SIERRA OAKS
8.40 mi away

Complete remodel kitchen: new counters cabinets appliances floor paint and trim. Complete remodel of fireplace wall and hearth. Complete remodel of master bath: new shower counters cabinets flooring paint and tile. Complete remodel of hall bath: new shower and tub counters cabinets flooring paint and tile. Change flooring in house.

ActiveElectrical PermitAddition and RemodelJul 2026
View Details
2026-081919 EP
๐Ÿ”งCox Electrical Services
10809 SIERRA OAKS
8.40 mi away

Complete remodel kitchen: new counters cabinets appliances floor paint and trim. Complete remodel of fireplace wall and hearth. Complete remodel of master bath: new shower counters cabinets flooring paint and tile. Complete remodel of hall bath: new shower and tub counters cabinets flooring paint and tile. Change flooring in house.

ActivePlumbing PermitAddition and RemodelJul 2026
View Details
2026-081919 PP
๐Ÿ”งClear Water Plumbing
10807 OWYHEE VW
10.94 mi away

Replace existing water heater with a tankless water heater

ActivePlumbing PermitRepairJul 2026
View Details
2026-085021 PP
๐Ÿ”งAustin Texas Water Heaters
10809 CROSBYTON LN
12.84 mi away

Installing outlet for water heater.

ActiveElectrical PermitRepairJul 2026
View Details
2026-088354 EP
๐Ÿ”งABC Home & Commercial Services
10845 TALLSALT DR

New construction of 1 story sfr

ActiveElectrical PermitNewJul 2026
View Details
2026-081062 EP
๐Ÿ”งIn Charge Electrical Services, LLC

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists