AVIALL PHASE 2 POUR STRIP REPLACEMENT SO
AVIALL PHASE 2 POUR STRIP REPLACEMENT SO is a renovation/alteration project at 2750 REGENT BLVD., Dfw Airport, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2011). The project has an estimated value of $600K.
๐Project Metrics
TDLR #EABPRJB1808224Project Closed
Project has been completed and closed
AVIALL PHASE 2 POUR STRIP REPLACEMENT SO is a Renovation/Alteration project located at 2750 REGENT BLVD., Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $600K. PARAMOUNT ASSOCIATES LP is the property owner and 4-D USA INC. is the design firm of record. The project was registered with TDLR on March 4, 2011.
โFrequently Asked Questions
What is AVIALL PHASE 2 POUR STRIP REPLACEMENT SO?
AVIALL PHASE 2 POUR STRIP REPLACEMENT SO is a renovation/alteration project at 2750 REGENT BLVD. in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remove concrete floor at south exterior wall, perform minor interior renovations, raise concrete landings and in
Is AVIALL PHASE 2 POUR STRIP REPLACEMENT SO open in Dfw Airport?
Construction on AVIALL PHASE 2 POUR STRIP REPLACEMENT SO is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2011. The building is finished and very likely open.
Where is AVIALL PHASE 2 POUR STRIP REPLACEMENT SO located?
AVIALL PHASE 2 POUR STRIP REPLACEMENT SO is located at 2750 REGENT BLVD., Dfw Airport, TX, 75261, in Dallas County.
Who is the owner or developer of AVIALL PHASE 2 POUR STRIP REPLACEMENT SO?
PARAMOUNT ASSOCIATES LP is the property owner/developer of record for AVIALL PHASE 2 POUR STRIP REPLACEMENT SO, per its TDLR project registration.
Who is the architect or design firm for AVIALL PHASE 2 POUR STRIP REPLACEMENT SO?
4-D USA INC. is the design firm of record for AVIALL PHASE 2 POUR STRIP REPLACEMENT SO, according to its TDLR filing.
How much does AVIALL PHASE 2 POUR STRIP REPLACEMENT SO cost and how big is it?
AVIALL PHASE 2 POUR STRIP REPLACEMENT SO has an estimated construction value of $600K, based on its TDLR filing.
๐Scope of Work
Remove concrete floor at south exterior wall, perform minor interior renovations, raise concrete landings and in
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 4, 2011
Review Complete
Inspection Complete
Closed
Apr 1, 2011