FANNIN HOLCOMBE BLDG FLOOD MITIGATION
FANNIN HOLCOMBE BLDG FLOOD MITIGATION is a renovation/alteration project at 6900 FANNIN ST, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2012). The project has an estimated value of $950K.
๐Project Metrics
TDLR #EABPRJB1808406Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes โ permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77030 (Houston)
One email per change. Unsubscribe in one click. Privacy.
FANNIN HOLCOMBE BLDG FLOOD MITIGATION is a Renovation/Alteration project located at 6900 FANNIN ST, Houston, TX 77030 in Houston, Texas. The project has an estimated value of $950K. M.D. ANDERSON CANCER CENTER is the property owner and WALTER P MOORE is the design firm of record. The project was registered with TDLR on March 8, 2011.
โFrequently Asked Questions
What is FANNIN HOLCOMBE BLDG FLOOD MITIGATION?
FANNIN HOLCOMBE BLDG FLOOD MITIGATION is a renovation/alteration project at 6900 FANNIN ST in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: install flood door at an existing door strengthen an existing wall to resisit flood water. seal around openngs p
Is FANNIN HOLCOMBE BLDG FLOOD MITIGATION open in Houston?
Construction on FANNIN HOLCOMBE BLDG FLOOD MITIGATION is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2012. The building is finished and very likely open.
Where is FANNIN HOLCOMBE BLDG FLOOD MITIGATION located?
FANNIN HOLCOMBE BLDG FLOOD MITIGATION is located at 6900 FANNIN ST, Houston, TX, 77030, in Harris County.
Who is the owner or developer of FANNIN HOLCOMBE BLDG FLOOD MITIGATION?
M.D. ANDERSON CANCER CENTER is the property owner/developer of record for FANNIN HOLCOMBE BLDG FLOOD MITIGATION, per its TDLR project registration.
Who is the architect or design firm for FANNIN HOLCOMBE BLDG FLOOD MITIGATION?
WALTER P MOORE is the design firm of record for FANNIN HOLCOMBE BLDG FLOOD MITIGATION, according to its TDLR filing.
How much does FANNIN HOLCOMBE BLDG FLOOD MITIGATION cost and how big is it?
FANNIN HOLCOMBE BLDG FLOOD MITIGATION has an estimated construction value of $950K, based on its TDLR filing.
๐Scope of Work
install flood door at an existing door strengthen an existing wall to resisit flood water. seal around openngs p
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 8, 2011
Review Complete
Inspection Complete
Closed
Dec 17, 2012
๐Related Projects
๐คSame Owner
$2.80B total๐Nearby Projects
Within 1 kmProperty Owner
Design Firm
Harris County Economy
Explore Area
Watch all construction in 77030 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.