Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
BROWN TRL. SEWER & SIDEWALK REPLACEMENTS
900-1200 BROWN TRAIL, Bedford, TX, 76021
BROWN TRL. SEWER & SIDEWALK REPLACEMENTS is a renovation/alteration project at 900-1200 BROWN TRAIL, Bedford, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2011). The project has an estimated value of $193K.
- Estimated project value
- $193K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
34 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
27 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76021 (Bedford)
One email per change. Unsubscribe in one click. Privacy.
BROWN TRL. SEWER & SIDEWALK REPLACEMENTS is a Renovation/Alteration project located at 900-1200 BROWN TRAIL, Bedford, TX 76021 in Bedford, Texas. The project has an estimated value of $193K. CITY OF BEDFORD is the property owner and J. RICHARD PERKINS P.E. is the design firm of record. The project was registered with TDLR on April 4, 2011.
Frequently Asked Questions
What is BROWN TRL. SEWER & SIDEWALK REPLACEMENTS?
BROWN TRL. SEWER & SIDEWALK REPLACEMENTS is a renovation/alteration project at 900-1200 BROWN TRAIL in Bedford, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace sanitary sewer main on east side of Brown Trailbehind the curb and build new sidewalks and curb ramps o
Is BROWN TRL. SEWER & SIDEWALK REPLACEMENTS open in Bedford?
Construction on BROWN TRL. SEWER & SIDEWALK REPLACEMENTS is complete — TDLR records show the project passed its required accessibility inspection in May 2011. The building is finished and very likely open.
Where is BROWN TRL. SEWER & SIDEWALK REPLACEMENTS located?
BROWN TRL. SEWER & SIDEWALK REPLACEMENTS is located at 900-1200 BROWN TRAIL, Bedford, TX, 76021, in Tarrant County.
Who is the owner or developer of BROWN TRL. SEWER & SIDEWALK REPLACEMENTS?
CITY OF BEDFORD is the property owner/developer of record for BROWN TRL. SEWER & SIDEWALK REPLACEMENTS, per its TDLR project registration.
Who is the architect or design firm for BROWN TRL. SEWER & SIDEWALK REPLACEMENTS?
J. RICHARD PERKINS P.E. is the design firm of record for BROWN TRL. SEWER & SIDEWALK REPLACEMENTS, according to its TDLR filing.
How much does BROWN TRL. SEWER & SIDEWALK REPLACEMENTS cost and how big is it?
BROWN TRL. SEWER & SIDEWALK REPLACEMENTS has an estimated construction value of $193K, based on its TDLR filing.
Scope of Work
Replace sanitary sewer main on east side of Brown Trailbehind the curb and build new sidewalks and curb ramps o
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
900-1200 BROWN TRAIL, Bedford, TX, 76021
Related Projects
Same Owner
$145.2M totalSame Design Firm
$466K totalWatch all construction in 76021 (Bedford)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Bedford?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.