Project intelligenceTDLR EABPRJB1811294New Construction
Funding type

This project is privately funded, on private land for private use.

BELL HELICOPTER - NEW AIRFIELD PARKING

600 E HURST BLVD, Fort Worth, TX, 76053

Construction complete · Aug 2011Project Closed

BELL HELICOPTER - NEW AIRFIELD PARKING is a new construction project at 600 E HURST BLVD, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2011). The project has an estimated value of $750K.

Estimated project value
$750K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 29, 201194 days across supplied datesAug 1, 2011

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    2 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76053 (Fort Worth)

One email per change. Unsubscribe in one click. Privacy.

BELL HELICOPTER - NEW AIRFIELD PARKING is a New Construction project located at 600 E HURST BLVD, Fort Worth, TX 76053 in Fort Worth, Texas. The project has an estimated value of $750K. BELL HELICOPTER is the property owner and MERRIMAN ASSOCIATES ARCHITECTS is the design firm of record. The project was registered with TDLR on April 29, 2011.

Frequently Asked Questions

What is BELL HELICOPTER - NEW AIRFIELD PARKING?

BELL HELICOPTER - NEW AIRFIELD PARKING is a new construction project at 600 E HURST BLVD in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: construction of new airfield campus parking lot, to addto the already existing parking lots throughout the rest

Is BELL HELICOPTER - NEW AIRFIELD PARKING open in Fort Worth?

Construction on BELL HELICOPTER - NEW AIRFIELD PARKING is complete — TDLR records show the project passed its required accessibility inspection in Aug 2011. The building is finished and very likely open.

Where is BELL HELICOPTER - NEW AIRFIELD PARKING located?

BELL HELICOPTER - NEW AIRFIELD PARKING is located at 600 E HURST BLVD, Fort Worth, TX, 76053, in Tarrant County.

Who is the owner or developer of BELL HELICOPTER - NEW AIRFIELD PARKING?

BELL HELICOPTER is the property owner/developer of record for BELL HELICOPTER - NEW AIRFIELD PARKING, per its TDLR project registration.

Who is the architect or design firm for BELL HELICOPTER - NEW AIRFIELD PARKING?

MERRIMAN ASSOCIATES ARCHITECTS is the design firm of record for BELL HELICOPTER - NEW AIRFIELD PARKING, according to its TDLR filing.

How much does BELL HELICOPTER - NEW AIRFIELD PARKING cost and how big is it?

BELL HELICOPTER - NEW AIRFIELD PARKING has an estimated construction value of $750K, based on its TDLR filing.

Scope of Work

construction of new airfield campus parking lot, to addto the already existing parking lots throughout the rest

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

600 E HURST BLVD, Fort Worth, TX, 76053

32.80614, -97.15783

Related City Permits

Building permits found at or near this location

600 E HURST BLVD, Fort Worth, TX 76053

Section A&B: Third party to modify select MEP items > Remove existing roof > Check roof deck joints to see if sealed or unsealed. If unsealed and greater than 1" in width, cover joints with strip of vapor barrirer membrane > Adhere 1/8" per foot fully tapered insulation to the concrete roof deck (start with A panel at 1.0" thickness) > Adhere 1/4" per foot polyiso crickets where applicable > Adhere DensDeck Prime StormX board to insulation > Adhere Johns Manville 115-mil Fleeceback TPO to coverboard Section C&D: Third party to install interior protection > Remove existing roof > Loose lay 1/2" DEXcell FA roof board on steel deck > Self-adhere JM Vapor Barrier SA to gypsum board > loose lay one (1) layer of 3.5" polyiso insulation > loose lay 1/2" per foot polyiso crickets where applicable > Mechanically gang fasten 5/8" DEXCell FA VSH board through lower layers to steel deck > Adhere Johns Manville 135-mil Fleeceback TPO to coverboard Section E: Third party to install interior protection > third party to modify select MEP items > Remove existing roof > Loose lay 1/2" DEXcell FA roof board on steel deck > Self-adhere JM Vapor Barrier SA to gypsum board > loose lay 1/8" per foot fully tapered insulation on vapor barrier (start with C panel at 2.0" thickness) > Loose lay 1/4" per foot polyiso crickets where applicable > Mechanically gang fasten 5/8" DEXCell FA VSH board through lower layers to steel deck > Adhere Johns Manville 135-mil Fleeceback TPO to coverboard Air Traffic Control Tower: Remove existing roof > Loose lay 1/2" DEXcell FA roof board on steel deck > Self-adhere JM Vapor Barrier SA to gypsum board > loose lay two (2) layers of 2.2" polyiso insulation > Mechanically gang fasten 5/8" DEXCell FA VSH board through lower layers to steel deck > Adhere Johns Manville 135-mil Fleeceback TPO to coverboard

FinaledRemodelIndustrialNov 2025
$1.5M
FTW-PB25-15333

Watch all construction in 76053 (Fort Worth)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Fort Worth?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.