Project intelligenceTDLR EABPRJB1812179New Construction
Funding type

This project is privately funded, on private land for private use.

DANCE STUDIO in Floresville, TX

246 PALOMA DRIVE, Floresville, TX, 78114

Construction complete · Sep 2011Project Closed

DANCE STUDIO is a new construction project at 246 PALOMA DRIVE, Floresville, in Wilson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2011). The project has an estimated value of $178K.

Estimated project value
$178K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 17, 2011107 days across supplied datesSep 1, 2011

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    15 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78114 (Floresville)

One email per change. Unsubscribe in one click. Privacy.

DANCE STUDIO is a New Construction project located at 246 PALOMA DRIVE, Floresville, TX 78114 in Floresville, Texas. The project has an estimated value of $178K. CARSON AND CHRISTINA BOURNE is the property owner and BRIAN SMITH DESIGNERS is the design firm of record. The project was registered with TDLR on May 17, 2011.

Frequently Asked Questions

What is DANCE STUDIO?

DANCE STUDIO is a new construction project at 246 PALOMA DRIVE in Floresville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The contractor will provide labor and/or materials for the work as outlined in the estimate and the following sp

Is DANCE STUDIO open in Floresville?

Construction on DANCE STUDIO is complete — TDLR records show the project passed its required accessibility inspection in Sep 2011. The building is finished and very likely open.

Where is DANCE STUDIO located?

DANCE STUDIO is located at 246 PALOMA DRIVE, Floresville, TX, 78114, in Wilson County.

Who is the owner or developer of DANCE STUDIO?

CARSON AND CHRISTINA BOURNE is the property owner/developer of record for DANCE STUDIO, per its TDLR project registration.

Who is the architect or design firm for DANCE STUDIO?

BRIAN SMITH DESIGNERS is the design firm of record for DANCE STUDIO, according to its TDLR filing.

How much does DANCE STUDIO cost and how big is it?

DANCE STUDIO has an estimated construction value of $178K, based on its TDLR filing.

Scope of Work

The contractor will provide labor and/or materials for the work as outlined in the estimate and the following sp

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

246 PALOMA DRIVE, Floresville, TX, 78114

29.12776, -98.14526

Watch all construction in 78114 (Floresville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Floresville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.