Project intelligenceTDLR EABPRJB1812632Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

DOWNTOWN SIDEWALK IMPROVEMENTS, EASTSIDE in Spearman, TX

200-300 BLOCK OF MAIN STREET, Spearman, TX, 79081

Construction complete · Dec 2011Project Closed

DOWNTOWN SIDEWALK IMPROVEMENTS, EASTSIDE is a renovation/alteration project at 200-300 BLOCK OF MAIN STREET, Spearman, in Hansford County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2011). The project has an estimated value of $298K.

Estimated project value
$298K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 25, 2011190 days across supplied datesDec 1, 2011

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    68 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    122 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79081 (Spearman)

One email per change. Unsubscribe in one click. Privacy.

DOWNTOWN SIDEWALK IMPROVEMENTS, EASTSIDE is a Renovation/Alteration project located at 200-300 BLOCK OF MAIN STREET, Spearman, TX 79081 in Spearman, Texas. The project has an estimated value of $298K. CITY OF SPEARMAN is the property owner and BRANDT ENGINEERS is the design firm of record. The project was registered with TDLR on May 25, 2011.

Frequently Asked Questions

What is DOWNTOWN SIDEWALK IMPROVEMENTS, EASTSIDE?

DOWNTOWN SIDEWALK IMPROVEMENTS, EASTSIDE is a renovation/alteration project at 200-300 BLOCK OF MAIN STREET in Spearman, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace 2 blocks of sidewalk on one side of the street

Is DOWNTOWN SIDEWALK IMPROVEMENTS, EASTSIDE open in Spearman?

Construction on DOWNTOWN SIDEWALK IMPROVEMENTS, EASTSIDE is complete — TDLR records show the project passed its required accessibility inspection in Dec 2011. The building is finished and very likely open.

Where is DOWNTOWN SIDEWALK IMPROVEMENTS, EASTSIDE located?

DOWNTOWN SIDEWALK IMPROVEMENTS, EASTSIDE is located at 200-300 BLOCK OF MAIN STREET, Spearman, TX, 79081, in Hansford County.

Who is the owner or developer of DOWNTOWN SIDEWALK IMPROVEMENTS, EASTSIDE?

CITY OF SPEARMAN is the property owner/developer of record for DOWNTOWN SIDEWALK IMPROVEMENTS, EASTSIDE, per its TDLR project registration.

Who is the architect or design firm for DOWNTOWN SIDEWALK IMPROVEMENTS, EASTSIDE?

BRANDT ENGINEERS is the design firm of record for DOWNTOWN SIDEWALK IMPROVEMENTS, EASTSIDE, according to its TDLR filing.

How much does DOWNTOWN SIDEWALK IMPROVEMENTS, EASTSIDE cost and how big is it?

DOWNTOWN SIDEWALK IMPROVEMENTS, EASTSIDE has an estimated construction value of $298K, based on its TDLR filing.

Scope of Work

Replace 2 blocks of sidewalk on one side of the street

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

200-300 BLOCK OF MAIN STREET, Spearman, TX, 79081

Loading location map…
36.20007, -101.19396

Watch all construction in 79081 (Spearman)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Spearman?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.