STILES DR STREET AND DRAINAGE, PHASE 1
STILES DR STREET AND DRAINAGE, PHASE 1 is a renovation/alteration project at 7201 - 7255 STILES DRIVE, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2012). The project has an estimated value of $1.3M.
๐Project Metrics
TDLR #EABPRJB1813356Project Closed
Project has been completed and closed
STILES DR STREET AND DRAINAGE, PHASE 1 is a Renovation/Alteration project located at 7201 - 7255 STILES DRIVE, El Paso, TX 79901 in El Paso, Texas. The project has an estimated value of $1.3M. CITY OF EL PASO is the property owner and CEA GROUP is the design firm of record. The project was registered with TDLR on June 9, 2011.
โFrequently Asked Questions
What is STILES DR STREET AND DRAINAGE, PHASE 1?
STILES DR STREET AND DRAINAGE, PHASE 1 is a renovation/alteration project at 7201 - 7255 STILES DRIVE in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: STREET AND DRAINAGE IMPROVEMENTS TO INCLUDE NEW CURB ANDGUTTER, CONCRETE SIDEWALKS, CONC. DRIVEWAYS, LANDSCAPIN
Is STILES DR STREET AND DRAINAGE, PHASE 1 open in El Paso?
Construction on STILES DR STREET AND DRAINAGE, PHASE 1 is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2012. The building is finished and very likely open.
Where is STILES DR STREET AND DRAINAGE, PHASE 1 located?
STILES DR STREET AND DRAINAGE, PHASE 1 is located at 7201 - 7255 STILES DRIVE, El Paso, TX, 79901, in El Paso County.
Who is the owner or developer of STILES DR STREET AND DRAINAGE, PHASE 1?
CITY OF EL PASO is the property owner/developer of record for STILES DR STREET AND DRAINAGE, PHASE 1, per its TDLR project registration.
Who is the architect or design firm for STILES DR STREET AND DRAINAGE, PHASE 1?
CEA GROUP is the design firm of record for STILES DR STREET AND DRAINAGE, PHASE 1, according to its TDLR filing.
How much does STILES DR STREET AND DRAINAGE, PHASE 1 cost and how big is it?
STILES DR STREET AND DRAINAGE, PHASE 1 has an estimated construction value of $1.3M, based on its TDLR filing.
๐Scope of Work
STREET AND DRAINAGE IMPROVEMENTS TO INCLUDE NEW CURB ANDGUTTER, CONCRETE SIDEWALKS, CONC. DRIVEWAYS, LANDSCAPIN
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 9, 2011
Review Complete
Inspection Complete
Closed
Jan 1, 2012