Project intelligenceTDLR EABPRJB1813356Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

STILES DR STREET AND DRAINAGE, PHASE 1 in El Paso, TX

7201 - 7255 STILES DRIVE, El Paso, TX, 79901

Construction complete · Jan 2012Project Closed

STILES DR STREET AND DRAINAGE, PHASE 1 is a renovation/alteration project at 7201 - 7255 STILES DRIVE, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2012). The project has an estimated value of $1.3M.

Estimated project value
$1.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 9, 2011206 days across supplied datesJan 1, 2012

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    22 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    184 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79901 (El Paso)

One email per change. Unsubscribe in one click. Privacy.

STILES DR STREET AND DRAINAGE, PHASE 1 is a Renovation/Alteration project located at 7201 - 7255 STILES DRIVE, El Paso, TX 79901 in El Paso, Texas. The project has an estimated value of $1.3M. CITY OF EL PASO is the property owner and CEA GROUP is the design firm of record. The project was registered with TDLR on June 9, 2011.

Frequently Asked Questions

What is STILES DR STREET AND DRAINAGE, PHASE 1?

STILES DR STREET AND DRAINAGE, PHASE 1 is a renovation/alteration project at 7201 - 7255 STILES DRIVE in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: STREET AND DRAINAGE IMPROVEMENTS TO INCLUDE NEW CURB ANDGUTTER, CONCRETE SIDEWALKS, CONC. DRIVEWAYS, LANDSCAPIN

Is STILES DR STREET AND DRAINAGE, PHASE 1 open in El Paso?

Construction on STILES DR STREET AND DRAINAGE, PHASE 1 is complete — TDLR records show the project passed its required accessibility inspection in Jan 2012. The building is finished and very likely open.

Where is STILES DR STREET AND DRAINAGE, PHASE 1 located?

STILES DR STREET AND DRAINAGE, PHASE 1 is located at 7201 - 7255 STILES DRIVE, El Paso, TX, 79901, in El Paso County.

Who is the owner or developer of STILES DR STREET AND DRAINAGE, PHASE 1?

CITY OF EL PASO is the property owner/developer of record for STILES DR STREET AND DRAINAGE, PHASE 1, per its TDLR project registration.

Who is the architect or design firm for STILES DR STREET AND DRAINAGE, PHASE 1?

CEA GROUP is the design firm of record for STILES DR STREET AND DRAINAGE, PHASE 1, according to its TDLR filing.

How much does STILES DR STREET AND DRAINAGE, PHASE 1 cost and how big is it?

STILES DR STREET AND DRAINAGE, PHASE 1 has an estimated construction value of $1.3M, based on its TDLR filing.

Scope of Work

STREET AND DRAINAGE IMPROVEMENTS TO INCLUDE NEW CURB ANDGUTTER, CONCRETE SIDEWALKS, CONC. DRIVEWAYS, LANDSCAPIN

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

7201 - 7255 STILES DRIVE, El Paso, TX, 79901

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 79901 (El Paso)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.