S CONGRESS
๐Project Metrics
TDLR #EABPRJB1814523Project Closed
Project has been completed and closed
๐Scope of Work
interior remodel and addition
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$2.0M total๐๏ธSame Design Firm
$7.2M total๐Related City Permits
Building permits found at or near this location
1. Replace one defective GFCI outlet in kitchen with an AF/GF. 2. Move exisitng kitchen recetpacle located at back of sink and relocate to the left of the sink. 3. Enclose exposed garbage disposal wring into a box. 4. Replace hallway and master bathroom receptacles with GFI. 5. Replace one exterior outlet with GFCI and in-use cover. 6. Replace back exterior light with new fixture and eliminate illegal wiring.
Express: replace 2 bedroom windows (like for like); replace water heater; replace HVAC
Express: replace 2 bedroom windows (like for like); replace water heater; replace HVAC
Express: replace 2 bedroom windows (like for like); replace water heater; replace HVAC
residential irrigation system