Project intelligenceTDLR EABPRJB1815876Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

PEARL EXPRESSWAY IMPROVEMENTS in Dallas, TX

JACKSON ST. TO LIVE OAK ST., Dallas, TX, 75201

Construction complete · Mar 2016Project Closed

PEARL EXPRESSWAY IMPROVEMENTS is a renovation/alteration project at JACKSON ST. TO LIVE OAK ST., Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2016). The project has an estimated value of $2.2M.

Estimated project value
$2.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 27, 20111,693 days across supplied datesMar 15, 2016

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    127 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    1,566 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75201 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

PEARL EXPRESSWAY IMPROVEMENTS is a Renovation/Alteration project located at JACKSON ST. TO LIVE OAK ST., Dallas, TX 75201 in Dallas, Texas. The project has an estimated value of $2.2M. CITY OF DALLAS PUBLIC WORKS & TRANSPORT. is the property owner and EJES is the design firm of record. The project was registered with TDLR on July 27, 2011.

Frequently Asked Questions

What is PEARL EXPRESSWAY IMPROVEMENTS?

PEARL EXPRESSWAY IMPROVEMENTS is a renovation/alteration project at JACKSON ST. TO LIVE OAK ST. in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruct Pearl Expressway from Pacific to Live Oak (approximately 1,000 feet). Work includes paving, drainag

Is PEARL EXPRESSWAY IMPROVEMENTS open in Dallas?

Construction on PEARL EXPRESSWAY IMPROVEMENTS is complete — TDLR records show the project passed its required accessibility inspection in Mar 2016. The building is finished and very likely open.

Where is PEARL EXPRESSWAY IMPROVEMENTS located?

PEARL EXPRESSWAY IMPROVEMENTS is located at JACKSON ST. TO LIVE OAK ST., Dallas, TX, 75201, in Dallas County.

Who is the owner or developer of PEARL EXPRESSWAY IMPROVEMENTS?

CITY OF DALLAS PUBLIC WORKS & TRANSPORT. is the property owner/developer of record for PEARL EXPRESSWAY IMPROVEMENTS, per its TDLR project registration.

Who is the architect or design firm for PEARL EXPRESSWAY IMPROVEMENTS?

EJES is the design firm of record for PEARL EXPRESSWAY IMPROVEMENTS, according to its TDLR filing.

How much does PEARL EXPRESSWAY IMPROVEMENTS cost and how big is it?

PEARL EXPRESSWAY IMPROVEMENTS has an estimated construction value of $2.2M, based on its TDLR filing.

Scope of Work

Reconstruct Pearl Expressway from Pacific to Live Oak (approximately 1,000 feet). Work includes paving, drainag

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

JACKSON ST. TO LIVE OAK ST., Dallas, TX, 75201

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75201 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.