SELERIX
SELERIX is a renovation/alteration project at 2851 CRAIG DRIVE Suite 300, Mckinney, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2011). The project has an estimated value of $120K.
๐Project Metrics
TDLR #EABPRJB1816730Project Closed
Project has been completed and closed
SELERIX is a Renovation/Alteration project located at 2851 CRAIG DRIVE Suite 300, Mckinney, TX 75070 in Mckinney, Texas. The project has an estimated value of $120K. PARKDAY ELDORADO PLAZA LP is the property owner and CHUCK LOBB ARCHITECTURAL is the design firm of record. The project was registered with TDLR on August 15, 2011.
โFrequently Asked Questions
What is SELERIX?
SELERIX is a renovation/alteration project at 2851 CRAIG DRIVE Suite 300 in Mckinney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Finish-out Revisions
Is SELERIX open in Mckinney?
Construction on SELERIX is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2011. The building is finished and very likely open.
Where is SELERIX located?
SELERIX is located at 2851 CRAIG DRIVE Suite 300, Mckinney, TX, 75070, in Collin County.
Who is the owner or developer of SELERIX?
PARKDAY ELDORADO PLAZA LP is the property owner/developer of record for SELERIX, per its TDLR project registration.
Who is the architect or design firm for SELERIX?
CHUCK LOBB ARCHITECTURAL is the design firm of record for SELERIX, according to its TDLR filing.
How much does SELERIX cost and how big is it?
SELERIX has an estimated construction value of $120K, based on its TDLR filing.
๐Scope of Work
Interior Finish-out Revisions
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 15, 2011
Review Complete
Inspection Complete
Closed
Oct 1, 2011