AIRPORT/IH 35 SITE PLAN
AIRPORT/IH 35 SITE PLAN is a renovation/alteration project at 4508 N. IH 35, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $346K across about 1 sq ft.
๐Project Metrics
TDLR #EABPRJB1817549Review Complete
Design review complete, construction may proceed
AIRPORT/IH 35 SITE PLAN is a Renovation/Alteration project located at 4508 N. IH 35, Austin, TX 78735 in Austin, Texas. The project has an estimated value of $346K covering 1 sq ft. 4508 MOTEL PROPERTIES LTD is the property owner and DOUCET & ASSOCIATES is the design firm of record. The project was registered with TDLR on August 26, 2011.
โFrequently Asked Questions
What is AIRPORT/IH 35 SITE PLAN?
AIRPORT/IH 35 SITE PLAN is a renovation/alteration project at 4508 N. IH 35 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Site Work
Is AIRPORT/IH 35 SITE PLAN open in Austin?
AIRPORT/IH 35 SITE PLAN is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is AIRPORT/IH 35 SITE PLAN located?
AIRPORT/IH 35 SITE PLAN is located at 4508 N. IH 35, Austin, TX, 78735, in Travis County.
Who is the owner or developer of AIRPORT/IH 35 SITE PLAN?
4508 MOTEL PROPERTIES LTD is the property owner/developer of record for AIRPORT/IH 35 SITE PLAN, per its TDLR project registration.
Who is the architect or design firm for AIRPORT/IH 35 SITE PLAN?
DOUCET & ASSOCIATES is the design firm of record for AIRPORT/IH 35 SITE PLAN, according to its TDLR filing.
How much does AIRPORT/IH 35 SITE PLAN cost and how big is it?
AIRPORT/IH 35 SITE PLAN has an estimated construction value of $346K and approximately 1 square feet (about $346.00K/sqft), based on its TDLR filing.
๐Scope of Work
Site Work
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 26, 2011
Review Complete
Aug 26, 2011
Inspection Complete
Closed
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Install Level 2 EV Charger
(Madhusudhan Saikiran) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton Gas Vertical
Replacement of complete existing central heat and air system with or without duct work **JACKIE DAVIS: Remove and replace existing HVAC unit and install GLXS4024; no structural change.
irrigation for lawn
๐Related Site Plans
City of Austin site plan approvals at this location