Project intelligenceTDLR EABPRJB2802926Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

STC- PECAN CAMPUS LOOP ROAD PHASE II

3201 W. PECAN BLVD, Mcallen, TX, 78501

Construction complete · Feb 2012Project Closed

STC- PECAN CAMPUS LOOP ROAD PHASE II is a renovation/alteration project at 3201 W. PECAN BLVD, Mcallen, in Hidalgo County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2012). The project has an estimated value of $400K.

Estimated project value
$400K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 1, 201192 days across supplied datesFeb 1, 2012

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78501 (Mcallen)

One email per change. Unsubscribe in one click. Privacy.

STC- PECAN CAMPUS LOOP ROAD PHASE II is a Renovation/Alteration project located at 3201 W. PECAN BLVD, Mcallen, TX 78501 in Mcallen, Texas. The project has an estimated value of $400K. SOUTH TEXAS COLLEGE is the property owner and PEREZ CONSULTING ENGINEERS is the design firm of record. The project was registered with TDLR on November 1, 2011.

Frequently Asked Questions

What is STC- PECAN CAMPUS LOOP ROAD PHASE II?

STC- PECAN CAMPUS LOOP ROAD PHASE II is a renovation/alteration project at 3201 W. PECAN BLVD in Mcallen, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demolition, roadway paving, drainage, lighting and landscaping; all in accordance with the plans and specificati

Is STC- PECAN CAMPUS LOOP ROAD PHASE II open in Mcallen?

Construction on STC- PECAN CAMPUS LOOP ROAD PHASE II is complete — TDLR records show the project passed its required accessibility inspection in Feb 2012. The building is finished and very likely open.

Where is STC- PECAN CAMPUS LOOP ROAD PHASE II located?

STC- PECAN CAMPUS LOOP ROAD PHASE II is located at 3201 W. PECAN BLVD, Mcallen, TX, 78501, in Hidalgo County.

Who is the owner or developer of STC- PECAN CAMPUS LOOP ROAD PHASE II?

SOUTH TEXAS COLLEGE is the property owner/developer of record for STC- PECAN CAMPUS LOOP ROAD PHASE II, per its TDLR project registration.

Who is the architect or design firm for STC- PECAN CAMPUS LOOP ROAD PHASE II?

PEREZ CONSULTING ENGINEERS is the design firm of record for STC- PECAN CAMPUS LOOP ROAD PHASE II, according to its TDLR filing.

How much does STC- PECAN CAMPUS LOOP ROAD PHASE II cost and how big is it?

STC- PECAN CAMPUS LOOP ROAD PHASE II has an estimated construction value of $400K, based on its TDLR filing.

Scope of Work

Demolition, roadway paving, drainage, lighting and landscaping; all in accordance with the plans and specificati

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3201 W. PECAN BLVD, Mcallen, TX, 78501

26.21841, -98.25155

Watch all construction in 78501 (Mcallen)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.