Project intelligenceTDLR EABPRJB2803261Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

CITY OF SANSOM PARK FIRE STATION

5500 BUCHANAN STREET, Sansom Park, TX, 76114

Construction complete · Sep 2012Project Closed

CITY OF SANSOM PARK FIRE STATION is a renovation/alteration project at 5500 BUCHANAN STREET, Sansom Park, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2012). The project has an estimated value of $2.1M.

Estimated project value
$2.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
9 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 8, 2011298 days across supplied datesSep 1, 2012

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    23 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    275 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76114 (Sansom Park)

One email per change. Unsubscribe in one click. Privacy.

CITY OF SANSOM PARK FIRE STATION is a Renovation/Alteration project located at 5500 BUCHANAN STREET, Sansom Park, TX 76114 in Sansom Park, Texas. The project has an estimated value of $2.1M. CITY OF SANSOM PARK is the property owner and MAGEE ARCHITECTS L.P. is the design firm of record. The project was registered with TDLR on November 8, 2011.

Frequently Asked Questions

What is CITY OF SANSOM PARK FIRE STATION?

CITY OF SANSOM PARK FIRE STATION is a renovation/alteration project at 5500 BUCHANAN STREET in Sansom Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing fire station to provide new housing facilities.

Is CITY OF SANSOM PARK FIRE STATION open in Sansom Park?

Construction on CITY OF SANSOM PARK FIRE STATION is complete — TDLR records show the project passed its required accessibility inspection in Sep 2012. The building is finished and very likely open.

Where is CITY OF SANSOM PARK FIRE STATION located?

CITY OF SANSOM PARK FIRE STATION is located at 5500 BUCHANAN STREET, Sansom Park, TX, 76114, in Tarrant County.

Who is the owner or developer of CITY OF SANSOM PARK FIRE STATION?

CITY OF SANSOM PARK is the property owner/developer of record for CITY OF SANSOM PARK FIRE STATION, per its TDLR project registration.

Who is the architect or design firm for CITY OF SANSOM PARK FIRE STATION?

MAGEE ARCHITECTS L.P. is the design firm of record for CITY OF SANSOM PARK FIRE STATION, according to its TDLR filing.

How much does CITY OF SANSOM PARK FIRE STATION cost and how big is it?

CITY OF SANSOM PARK FIRE STATION has an estimated construction value of $2.1M, based on its TDLR filing.

Scope of Work

Renovation of existing fire station to provide new housing facilities.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5500 BUCHANAN STREET, Sansom Park, TX, 76114

Loading location map…
32.80350, -97.40216

Watch all construction in 76114 (Sansom Park)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Sansom Park?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.