RED LOBSTER #6240
RED LOBSTER #6240 is a renovation/alteration project at 17415 US 281 N, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2011). The project has an estimated value of $80K.
๐Project Metrics
TDLR #EABPRJB2803601Project Closed
Project has been completed and closed
RED LOBSTER #6240 is a Renovation/Alteration project located at 17415 US 281 N, San Antonio, TX 78232 in San Antonio, Texas. The project has an estimated value of $80K. DARDEN SW LLC is the property owner and HMD GROUP is the design firm of record. The project was registered with TDLR on November 15, 2011.
โFrequently Asked Questions
What is RED LOBSTER #6240?
RED LOBSTER #6240 is a renovation/alteration project at 17415 US 281 N in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Restroom remodel. Replacing finishes and fixtures in themens and womens restrooms.
Is RED LOBSTER #6240 open in San Antonio?
Construction on RED LOBSTER #6240 is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2011. The building is finished and very likely open.
Where is RED LOBSTER #6240 located?
RED LOBSTER #6240 is located at 17415 US 281 N, San Antonio, TX, 78232, in Bexar County.
Who is the owner or developer of RED LOBSTER #6240?
DARDEN SW LLC is the property owner/developer of record for RED LOBSTER #6240, per its TDLR project registration.
Who is the architect or design firm for RED LOBSTER #6240?
HMD GROUP is the design firm of record for RED LOBSTER #6240, according to its TDLR filing.
How much does RED LOBSTER #6240 cost and how big is it?
RED LOBSTER #6240 has an estimated construction value of $80K, based on its TDLR filing.
๐Scope of Work
Restroom remodel. Replacing finishes and fixtures in themens and womens restrooms.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 15, 2011
Review Complete
Inspection Complete
Closed
Dec 1, 2011