Project intelligenceTDLR EABPRJB2805866New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

FLOYD BRANCH STORM DRAIN IMPROVEMENTS GR in Richardson, TX

PHILLIPS BRIDGE NORTH TO GREER, Richardson, TX, 75080

Construction complete · Sep 2013Project Closed

FLOYD BRANCH STORM DRAIN IMPROVEMENTS GR is a new construction project at PHILLIPS BRIDGE NORTH TO GREER, Richardson, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2013). The project has an estimated value of $5.5M.

Estimated project value
$5.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 5, 2012605 days across supplied datesSep 1, 2013

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    56 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    549 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75080 (Richardson)

One email per change. Unsubscribe in one click. Privacy.

FLOYD BRANCH STORM DRAIN IMPROVEMENTS GR is a New Construction project located at PHILLIPS BRIDGE NORTH TO GREER, Richardson, TX 75080 in Richardson, Texas. The project has an estimated value of $5.5M. CITY OF RICHARDSON is the property owner and FREESE AND NICHOLS is the design firm of record. The project was registered with TDLR on January 5, 2012.

Frequently Asked Questions

What is FLOYD BRANCH STORM DRAIN IMPROVEMENTS GR?

FLOYD BRANCH STORM DRAIN IMPROVEMENTS GR is a new construction project at PHILLIPS BRIDGE NORTH TO GREER in Richardson, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of 2500 LF of multiple box culverts, a westbound turn lain on Main Street from Texas to US 75 and

Is FLOYD BRANCH STORM DRAIN IMPROVEMENTS GR open in Richardson?

Construction on FLOYD BRANCH STORM DRAIN IMPROVEMENTS GR is complete — TDLR records show the project passed its required accessibility inspection in Sep 2013. The building is finished and very likely open.

Where is FLOYD BRANCH STORM DRAIN IMPROVEMENTS GR located?

FLOYD BRANCH STORM DRAIN IMPROVEMENTS GR is located at PHILLIPS BRIDGE NORTH TO GREER, Richardson, TX, 75080, in Dallas County.

Who is the owner or developer of FLOYD BRANCH STORM DRAIN IMPROVEMENTS GR?

CITY OF RICHARDSON is the property owner/developer of record for FLOYD BRANCH STORM DRAIN IMPROVEMENTS GR, per its TDLR project registration.

Who is the architect or design firm for FLOYD BRANCH STORM DRAIN IMPROVEMENTS GR?

FREESE AND NICHOLS is the design firm of record for FLOYD BRANCH STORM DRAIN IMPROVEMENTS GR, according to its TDLR filing.

How much does FLOYD BRANCH STORM DRAIN IMPROVEMENTS GR cost and how big is it?

FLOYD BRANCH STORM DRAIN IMPROVEMENTS GR has an estimated construction value of $5.5M, based on its TDLR filing.

Scope of Work

Installation of 2500 LF of multiple box culverts, a westbound turn lain on Main Street from Texas to US 75 and

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

PHILLIPS BRIDGE NORTH TO GREER, Richardson, TX, 75080

Loading location map…
32.95354, -96.73235

Watch all construction in 75080 (Richardson)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Richardson?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.