Project intelligenceTDLR EABPRJB2806541Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

3RD FLOOR BUILD OUT

301 OLD MAIN, College Station, TX, 77845

Construction complete · Jul 2012Project Closed

3RD FLOOR BUILD OUT is a renovation/alteration project at 301 OLD MAIN, College Station, in Brazos County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2012). The project has an estimated value of $1.9M.

Estimated project value
$1.9M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 18, 2012165 days across supplied datesJul 1, 2012

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    14 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    151 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77845 (College Station)

One email per change. Unsubscribe in one click. Privacy.

3RD FLOOR BUILD OUT is a Renovation/Alteration project located at 301 OLD MAIN, College Station, TX 77845 in College Station, Texas. The project has an estimated value of $1.9M. TEXAS A&M UNIVERISTY SYSTEM is the property owner and PERKINS+WILL is the design firm of record. The project was registered with TDLR on January 18, 2012.

Frequently Asked Questions

What is 3RD FLOOR BUILD OUT?

3RD FLOOR BUILD OUT is a renovation/alteration project at 301 OLD MAIN in College Station, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Finish out of 3 laboratories on the 3rd Floor of the ILSbuilding.

Is 3RD FLOOR BUILD OUT open in College Station?

Construction on 3RD FLOOR BUILD OUT is complete — TDLR records show the project passed its required accessibility inspection in Jul 2012. The building is finished and very likely open.

Where is 3RD FLOOR BUILD OUT located?

3RD FLOOR BUILD OUT is located at 301 OLD MAIN, College Station, TX, 77845, in Brazos County.

Who is the owner or developer of 3RD FLOOR BUILD OUT?

TEXAS A&M UNIVERISTY SYSTEM is the property owner/developer of record for 3RD FLOOR BUILD OUT, per its TDLR project registration.

Who is the architect or design firm for 3RD FLOOR BUILD OUT?

PERKINS+WILL is the design firm of record for 3RD FLOOR BUILD OUT, according to its TDLR filing.

How much does 3RD FLOOR BUILD OUT cost and how big is it?

3RD FLOOR BUILD OUT has an estimated construction value of $1.9M, based on its TDLR filing.

Scope of Work

Finish out of 3 laboratories on the 3rd Floor of the ILSbuilding.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

301 OLD MAIN, College Station, TX, 77845

30.61480, -96.34261

Watch all construction in 77845 (College Station)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Brazos

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists