RACKSPACE PHASE 4A
RACKSPACE PHASE 4A is a renovation/alteration project at 5000 WALZEM, Windcrest, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2012). The project has an estimated value of $8.0M.
Project Metrics
TDLR #EABPRJB2806844Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78218 (Windcrest)
One email per change. Unsubscribe in one click. Privacy.
RACKSPACE PHASE 4A is a Renovation/Alteration project located at 5000 WALZEM, Windcrest, TX 78218 in Windcrest, Texas. The project has an estimated value of $8.0M. RACKSPACE is the property owner and STUDIO 8 ARCHTIECTS is the design firm of record. The project was registered with TDLR on January 24, 2012.
Frequently Asked Questions
What is RACKSPACE PHASE 4A?
RACKSPACE PHASE 4A is a renovation/alteration project at 5000 WALZEM in Windcrest, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: offices, conference rooms, building support spaces, Break Area, Restrooms and Media Room
Is RACKSPACE PHASE 4A open in Windcrest?
Construction on RACKSPACE PHASE 4A is complete — TDLR records show the project passed its required accessibility inspection in Aug 2012. The building is finished and very likely open.
Where is RACKSPACE PHASE 4A located?
RACKSPACE PHASE 4A is located at 5000 WALZEM, Windcrest, TX, 78218, in Bexar County.
Who is the owner or developer of RACKSPACE PHASE 4A?
RACKSPACE is the property owner/developer of record for RACKSPACE PHASE 4A, per its TDLR project registration.
Who is the architect or design firm for RACKSPACE PHASE 4A?
STUDIO 8 ARCHTIECTS is the design firm of record for RACKSPACE PHASE 4A, according to its TDLR filing.
How much does RACKSPACE PHASE 4A cost and how big is it?
RACKSPACE PHASE 4A has an estimated construction value of $8.0M, based on its TDLR filing.
Scope of Work
offices, conference rooms, building support spaces, Break Area, Restrooms and Media Room
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Compliance Timeline
Project Timeline
Filed
Jan 24, 2012
Review Complete
Inspection Complete
Closed
Aug 1, 2012
Related Projects
Same Owner
$17.0M totalSame Design Firm
$1.22B totalProperty Owner
Design Firm
Bexar County Economy
Explore Area
Watch all construction in 78218 (Windcrest)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.