Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
PHASE TWO - FLEWELLEN OAKS SOUTH in Fulshear, TX
6450 CROSS CREEK BEND LN., Fulshear, TX, 77441
PHASE TWO - FLEWELLEN OAKS SOUTH is a new construction project at 6450 CROSS CREEK BEND LN., Fulshear, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2012). The project has an estimated value of $200K.
- Estimated project value
- $200K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
4 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
57 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77441 (Fulshear)
One email per change. Unsubscribe in one click. Privacy.
PHASE TWO - FLEWELLEN OAKS SOUTH is a New Construction project located at 6450 CROSS CREEK BEND LN., Fulshear, TX 77441 in Fulshear, Texas. The project has an estimated value of $200K. TRENDMAKER HOMES INC. is the property owner and SWA GROUP is the design firm of record. The project was registered with TDLR on March 5, 2012.
Frequently Asked Questions
What is PHASE TWO - FLEWELLEN OAKS SOUTH?
PHASE TWO - FLEWELLEN OAKS SOUTH is a new construction project at 6450 CROSS CREEK BEND LN. in Fulshear, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Concrete trails, grading, planting, and irrigation.
Is PHASE TWO - FLEWELLEN OAKS SOUTH open in Fulshear?
Construction on PHASE TWO - FLEWELLEN OAKS SOUTH is complete — TDLR records show the project passed its required accessibility inspection in May 2012. The building is finished and very likely open.
Where is PHASE TWO - FLEWELLEN OAKS SOUTH located?
PHASE TWO - FLEWELLEN OAKS SOUTH is located at 6450 CROSS CREEK BEND LN., Fulshear, TX, 77441, in Fort Bend County.
Who is the owner or developer of PHASE TWO - FLEWELLEN OAKS SOUTH?
TRENDMAKER HOMES INC. is the property owner/developer of record for PHASE TWO - FLEWELLEN OAKS SOUTH, per its TDLR project registration.
Who is the architect or design firm for PHASE TWO - FLEWELLEN OAKS SOUTH?
SWA GROUP is the design firm of record for PHASE TWO - FLEWELLEN OAKS SOUTH, according to its TDLR filing.
How much does PHASE TWO - FLEWELLEN OAKS SOUTH cost and how big is it?
PHASE TWO - FLEWELLEN OAKS SOUTH has an estimated construction value of $200K, based on its TDLR filing.
Scope of Work
Concrete trails, grading, planting, and irrigation.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
6450 CROSS CREEK BEND LN., Fulshear, TX, 77441
Related Projects
Same Owner
$3.5M totalNearby Projects
Within 0.6 miWatch all construction in 77441 (Fulshear)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Fulshear?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.