ORANGE LEAF FROZEN YOGURT
ORANGE LEAF FROZEN YOGURT is a renovation/alteration project at 4015 SOUTH IH-35, SUITE 730, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2012). The project has an estimated value of $55K.
๐Project Metrics
TDLR #EABPRJB2810371Project Closed
Project has been completed and closed
ORANGE LEAF FROZEN YOGURT is a Renovation/Alteration project located at 4015 SOUTH IH-35, SUITE 730, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $55K. TANGER OUTLETS is the property owner and VILLA PARK ARCHITECTURE is the design firm of record. The project was registered with TDLR on March 30, 2012.
โFrequently Asked Questions
What is ORANGE LEAF FROZEN YOGURT?
ORANGE LEAF FROZEN YOGURT is a renovation/alteration project at 4015 SOUTH IH-35, SUITE 730 in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant finish out in exsiting tenant space.
Is ORANGE LEAF FROZEN YOGURT open in San Marcos?
Construction on ORANGE LEAF FROZEN YOGURT is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2012. The building is finished and very likely open.
Where is ORANGE LEAF FROZEN YOGURT located?
ORANGE LEAF FROZEN YOGURT is located at 4015 SOUTH IH-35, SUITE 730, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of ORANGE LEAF FROZEN YOGURT?
TANGER OUTLETS is the property owner/developer of record for ORANGE LEAF FROZEN YOGURT, per its TDLR project registration.
Who is the architect or design firm for ORANGE LEAF FROZEN YOGURT?
VILLA PARK ARCHITECTURE is the design firm of record for ORANGE LEAF FROZEN YOGURT, according to its TDLR filing.
How much does ORANGE LEAF FROZEN YOGURT cost and how big is it?
ORANGE LEAF FROZEN YOGURT has an estimated construction value of $55K, based on its TDLR filing.
๐Scope of Work
Tenant finish out in exsiting tenant space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 30, 2012
Review Complete
Inspection Complete
Closed
Sep 1, 2012
๐Related Projects
๐คSame Owner
$701K total๐๏ธSame Design Firm
$424.7M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 Ton Horizontal Heat Pump System
Express: replace 17 windows
New pool
Expedited Review - New Construction of a 2-Story Single Family Res. [3bed 3.5bath] with Habitable Attic and attached 1-car Garage
Expedited Review - New Construction of a 2-Story Secondary Apartment [2bed 2bath]