TALBOTS
TALBOTS is a renovation/alteration project at 8201 QUAKER AVE., STE. 146, Lubbock, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2012). The project has an estimated value of $105K.
๐Project Metrics
TDLR #EABPRJB2811295Project Closed
Project has been completed and closed
TALBOTS is a Renovation/Alteration project located at 8201 QUAKER AVE., STE. 146, Lubbock, TX 79424 in Lubbock, Texas. The project has an estimated value of $105K. GPF LUBBOCK ASSOCIATES LIMITED PARTNERSH is the property owner and TALBOTS INC, THE is the design firm of record. The project was registered with TDLR on April 16, 2012.
โFrequently Asked Questions
What is TALBOTS?
TALBOTS is a renovation/alteration project at 8201 QUAKER AVE., STE. 146 in Lubbock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Downsizing of existing suite.
Is TALBOTS open in Lubbock?
Construction on TALBOTS is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2012. The building is finished and very likely open.
Where is TALBOTS located?
TALBOTS is located at 8201 QUAKER AVE., STE. 146, Lubbock, TX, 79424, in Lubbock County.
Who is the owner or developer of TALBOTS?
GPF LUBBOCK ASSOCIATES LIMITED PARTNERSH is the property owner/developer of record for TALBOTS, per its TDLR project registration.
Who is the architect or design firm for TALBOTS?
TALBOTS INC, THE is the design firm of record for TALBOTS, according to its TDLR filing.
How much does TALBOTS cost and how big is it?
TALBOTS has an estimated construction value of $105K, based on its TDLR filing.
๐Scope of Work
Downsizing of existing suite.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 16, 2012
Review Complete
Inspection Complete
Closed
Aug 1, 2012