MISSION REACH is a renovation/alteration project at 9101 GRAF ROAD, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2013). The project has an estimated value of $1.8M.
๐Project Metrics
TDLR #EABPRJB2811454Project Closed
Project has been completed and closed
MISSION REACH is a Renovation/Alteration project located at 9101 GRAF ROAD, San Antonio, TX 78214 in San Antonio, Texas. The project has an estimated value of $1.8M. RIALTO STUDIO is the property owner and RIALTO STUDIO is the design firm of record. The project was registered with TDLR on April 18, 2012.
โFrequently Asked Questions
What is MISSION REACH?
MISSION REACH is a renovation/alteration project at 9101 GRAF ROAD in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: SIDEWALK CONSTRUCTION ALONG EXISTING ROAD. PAVING PLAZA& ROADWAY INTERSECTION. RV445
Is MISSION REACH open in San Antonio?
Construction on MISSION REACH is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2013. The building is finished and very likely open.
Where is MISSION REACH located?
MISSION REACH is located at 9101 GRAF ROAD, San Antonio, TX, 78214, in Bexar County.
Who is the owner or developer of MISSION REACH?
RIALTO STUDIO is the property owner/developer of record for MISSION REACH, per its TDLR project registration.
Who is the architect or design firm for MISSION REACH?
RIALTO STUDIO is the design firm of record for MISSION REACH, according to its TDLR filing.
How much does MISSION REACH cost and how big is it?
MISSION REACH has an estimated construction value of $1.8M, based on its TDLR filing.
๐Scope of Work
SIDEWALK CONSTRUCTION ALONG EXISTING ROAD. PAVING PLAZA& ROADWAY INTERSECTION. RV445
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 18, 2012
Review Complete
Inspection Complete
Closed
Aug 1, 2013