FIREHOUSE HOSTEL
๐Project Metrics
TDLR #EABPRJB2812394Project Closed
Project has been completed and closed
๐Scope of Work
Non-structural remodel of existing building. Adding newshowers and bathrooms, as well as updating rooms for ov
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$1.4M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work MAURICO COJULUM
Install new GE 200A Nema 3 Meter and Main Panel. (2) 5/8 Ground Rods. #6 Bare Copper (1) Surge Protector (1) Intersystem Bonding Bridge GE Breakers (1) 2P 60 (1) 2P 30A GFCI. Ground Feed meter. This is a service upgrade of the current meter and panel. Not new construction.
Express- Paint Install Drywall Change Valves
New irrigation system with 7 zones
Express- Paint Install Drywall Change Valves