Project intelligenceTDLR EABPRJB2813054New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

CITY OF LUFKIN 2012 STEP

FEAGIN, YORK AND KURTH DRIVE, Lufkin, TX, 75904

Construction complete · Mar 2013Project Closed

CITY OF LUFKIN 2012 STEP is a new construction project at FEAGIN, YORK AND KURTH DRIVE, Lufkin, in Angelina County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2013). The project has an estimated value of $1.5M.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 15, 2012290 days across supplied datesMar 1, 2013

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    109 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    181 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75904 (Lufkin)

One email per change. Unsubscribe in one click. Privacy.

CITY OF LUFKIN 2012 STEP is a New Construction project located at FEAGIN, YORK AND KURTH DRIVE, Lufkin, TX 75904 in Lufkin, Texas. The project has an estimated value of $1.5M. CITY OF LUFKIN is the property owner and KSA ENGINEERS INC. is the design firm of record. The project was registered with TDLR on May 15, 2012.

Frequently Asked Questions

What is CITY OF LUFKIN 2012 STEP?

CITY OF LUFKIN 2012 STEP is a new construction project at FEAGIN, YORK AND KURTH DRIVE in Lufkin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Project consists of approximately 15,350 L.F. of 5' widesidewalk, within existing City or TxDOT ROW, on Feagin

Is CITY OF LUFKIN 2012 STEP open in Lufkin?

Construction on CITY OF LUFKIN 2012 STEP is complete — TDLR records show the project passed its required accessibility inspection in Mar 2013. The building is finished and very likely open.

Where is CITY OF LUFKIN 2012 STEP located?

CITY OF LUFKIN 2012 STEP is located at FEAGIN, YORK AND KURTH DRIVE, Lufkin, TX, 75904, in Angelina County.

Who is the owner or developer of CITY OF LUFKIN 2012 STEP?

CITY OF LUFKIN is the property owner/developer of record for CITY OF LUFKIN 2012 STEP, per its TDLR project registration.

Who is the architect or design firm for CITY OF LUFKIN 2012 STEP?

KSA ENGINEERS INC. is the design firm of record for CITY OF LUFKIN 2012 STEP, according to its TDLR filing.

How much does CITY OF LUFKIN 2012 STEP cost and how big is it?

CITY OF LUFKIN 2012 STEP has an estimated construction value of $1.5M, based on its TDLR filing.

Scope of Work

Project consists of approximately 15,350 L.F. of 5' widesidewalk, within existing City or TxDOT ROW, on Feagin

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

FEAGIN, YORK AND KURTH DRIVE, Lufkin, TX, 75904

31.35858, -94.73443

Watch all construction in 75904 (Lufkin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.