Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
KILLEEN TERMINAL EXPANSION PKG 2
8101 SOUTH CLEAR CREEK ROAD Ted C. Connell Terminal Build, Killeen, TX, 76549
KILLEEN TERMINAL EXPANSION PKG 2 is a additions to existing building project at 8101 SOUTH CLEAR CREEK ROAD Ted C. Connell Terminal Build, Killeen, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2014). The project has an estimated value of $6.7M.
- Estimated project value
- $6.7M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 9mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
70 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
621 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76549 (Killeen)
One email per change. Unsubscribe in one click. Privacy.
KILLEEN TERMINAL EXPANSION PKG 2 is a Additions to Existing Building project located at 8101 SOUTH CLEAR CREEK ROAD Ted C. Connell Terminal Build, Killeen, TX 76549 in Killeen, Texas. The project has an estimated value of $6.7M. KILLEEN FORT HOOD REGIONAL AIRPORT is the property owner and JACOBS ENGINEERING GROUP is the design firm of record. The project was registered with TDLR on May 23, 2012.
Frequently Asked Questions
What is KILLEEN TERMINAL EXPANSION PKG 2?
KILLEEN TERMINAL EXPANSION PKG 2 is a additions to existing building project at 8101 SOUTH CLEAR CREEK ROAD Ted C. Connell Terminal Build in Killeen, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Package 2: Expand TSA Bag Room to the north, re-configure TSA administrative support space, modify the existing
Is KILLEEN TERMINAL EXPANSION PKG 2 open in Killeen?
Construction on KILLEEN TERMINAL EXPANSION PKG 2 is complete — TDLR records show the project passed its required accessibility inspection in Apr 2014. The building is finished and very likely open.
Where is KILLEEN TERMINAL EXPANSION PKG 2 located?
KILLEEN TERMINAL EXPANSION PKG 2 is located at 8101 SOUTH CLEAR CREEK ROAD Ted C. Connell Terminal Build, Killeen, TX, 76549, in Bell County.
Who is the owner or developer of KILLEEN TERMINAL EXPANSION PKG 2?
KILLEEN FORT HOOD REGIONAL AIRPORT is the property owner/developer of record for KILLEEN TERMINAL EXPANSION PKG 2, per its TDLR project registration.
Who is the architect or design firm for KILLEEN TERMINAL EXPANSION PKG 2?
JACOBS ENGINEERING GROUP is the design firm of record for KILLEEN TERMINAL EXPANSION PKG 2, according to its TDLR filing.
How much does KILLEEN TERMINAL EXPANSION PKG 2 cost and how big is it?
KILLEEN TERMINAL EXPANSION PKG 2 has an estimated construction value of $6.7M, based on its TDLR filing.
Scope of Work
Package 2: Expand TSA Bag Room to the north, re-configure TSA administrative support space, modify the existing
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
8101 SOUTH CLEAR CREEK ROAD Ted C. Connell Terminal Build, Killeen, TX, 76549
Related Projects
Watch all construction in 76549 (Killeen)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Killeen?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.