Project intelligenceTDLR EABPRJB2814108Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

CSHS PHASE II FH ADDITION in Southlake, TX

1501 W. SOUTHLAKE BLVD., Southlake, TX, 76092

Construction complete · Oct 2012Project Closed

CSHS PHASE II FH ADDITION is a additions to existing building project at 1501 W. SOUTHLAKE BLVD., Southlake, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2012). The project has an estimated value of $400K.

Estimated project value
$400K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 5, 2012118 days across supplied datesOct 1, 2012

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    26 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76092 (Southlake)

One email per change. Unsubscribe in one click. Privacy.

CSHS PHASE II FH ADDITION is a Additions to Existing Building project located at 1501 W. SOUTHLAKE BLVD., Southlake, TX 76092 in Southlake, Texas. The project has an estimated value of $400K. CARROLL ISD is the property owner and NATEX ARCHITECTS is the design firm of record. The project was registered with TDLR on June 5, 2012.

Frequently Asked Questions

What is CSHS PHASE II FH ADDITION?

CSHS PHASE II FH ADDITION is a additions to existing building project at 1501 W. SOUTHLAKE BLVD. in Southlake, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Locker room addition to existing field house

Is CSHS PHASE II FH ADDITION open in Southlake?

Construction on CSHS PHASE II FH ADDITION is complete — TDLR records show the project passed its required accessibility inspection in Oct 2012. The building is finished and very likely open.

Where is CSHS PHASE II FH ADDITION located?

CSHS PHASE II FH ADDITION is located at 1501 W. SOUTHLAKE BLVD., Southlake, TX, 76092, in Tarrant County.

Who is the owner or developer of CSHS PHASE II FH ADDITION?

CARROLL ISD is the property owner/developer of record for CSHS PHASE II FH ADDITION, per its TDLR project registration.

Who is the architect or design firm for CSHS PHASE II FH ADDITION?

NATEX ARCHITECTS is the design firm of record for CSHS PHASE II FH ADDITION, according to its TDLR filing.

How much does CSHS PHASE II FH ADDITION cost and how big is it?

CSHS PHASE II FH ADDITION has an estimated construction value of $400K, based on its TDLR filing.

Scope of Work

Locker room addition to existing field house

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1501 W. SOUTHLAKE BLVD., Southlake, TX, 76092

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76092 (Southlake)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Southlake?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.